flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Under40 Leadership Summit draws 71 young leaders to Chicago

Under40 Leadership Summit draws 71 young leaders to Chicago

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”


By By Robert Cassidy | November 11, 2012
Dont touch the ivyits historic! The U40 Leadership Summit participants assemb
Dont touch the ivyits historic! The U40 Leadership Summit participants assembled before the 400-foot centerfield sign at Wrig
This article first appeared in the November 2012 issue of BD+C.

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”

That was the theme of Building Design+Construction’s Second Annual “Under40 Leadership Summit,” held October 3-5 in partnership with AIA Chicago. The program brought together past honorees in BD+C’s “40 Under 40” program with under-40 AEC professionals nominated by their respective firms for networking and interactive leadership development.

The two-and-a-half-day program got started Wednesday afternoon, October 3, with a two-hour tour of Chicago’s architectural heritage along the Chicago River. A docent from the Chicago Architecture Foundation provided an articulate commentary on more than 50 architectural treasures, including works by Harry Weese, Bertrand Goldberg, SOM, and Perkins+Will.

Later that evening, the U40 attendees assembled at the Hotel Monaco, where Autodesk Fellow Tom Wujec, the Summit’s principal facilitator, led them in “The Great Chicago Marshmallow Challenge.” Teams of three or four were given 20 sticks of spaghetti, a yard of tape, a yard of string, and a marshmallow. They had 18 minutes to erect the tallest structure they could, with the stipulation that the marshmallow had to be on top.

Several structures collapsed. Participants were surprised by how much the marshmallow weighed. The winning structure measured 29½ inches in height—about average, according to Wujec, but well short of the record (more than 50 inches). No marshmallows were eaten during the competition (it happens, Wujec says).

Thursday, October 4, was devoted entirely to Wujec’s “Create with Clarity” mobile workshop. Wujec started the group off with what seemed to be a simple exercise: without using words, visualize—through drawing—how to make toast.

Where they came from


The following organizations were represented at the U40 Leadership Summit:

Adrian Smith + Gordon Gill, Argonne National Laboratory, Arquitectonica, BSA LifeStructures, Contract Management Inc. Dewberry, DLR Group, Enclos – Advanced Technology Studio, G3 Construction Group, Gensler, Harley Ellis Devereaux, HDR Architecture, Heery International, Hill International, HKS Architects, HMC Architects, Hoar Program Management, HOK, Johnson Controls, KJWW Engineering Consultants, KLMK Group, Legat Architects, Montalba Architects, Mortenson, Niles Bolton Associates, Norcon Inc., O’Brien Construction, Pepper Construction, Perkins+Will, Playground Ideas, Reichgott Engineering, Rogers Krajnak Architects, roomTEN Design, Ryan Companies US, School of the Art Institute of Chicago, SmithGroupJJR, Solomon Cordwell Buenz, Swinerton Builders, Syska Hennessy Group, Tarlton Corporation, Tilton Kelly + Bell, TLC Engineering for Architecture, University of Illinois at Urbana-Champaign, UrbanWorks, Valerio Dewalt Train Associates, VOA Associates, Walker Parking Consultants, Walter P Moore & Associates, and Wight & Co.

Teams of six to eight then each took on a specific question related to their professional or personal lives. Among the topics: How do we grow our firm? How do we use technology more wisely? How do we balance the demands of work with the needs of our personal lives and families?

The teams then went out into the city—to the North Michigan Avenue “Magnificent Mile,” to the Lake Michigan lakefront, to Millennium Park. Their mission: to find inspiration that would help them present a visual representation of their question—and even a solution.

Upon their return, the teams engaged in extensive development of the oversize posters for their visual presentations, a couple of which also took the form of a skit. Final presentations were made in rapid order,

Wujec then led the entire group in a discussion of the meaning of the visualizations and how to apply the process and concepts learned in their daily work and personal lives.

To the Friendly Confines

Friday, October 5, opened with an early morning bus ride to Wrigley Field, home of the Chicago Cubs, where the group was greeted by Tom Ricketts, the team chairman, Steven J. Jacobsen, SCDP, President of Jacobsen Development Advisors, and Carl Rice, Vice President of Baseball Operations for the Cubs.

Jacobsen, who has been retained by the Cubs to create the business plan and high-level concepts for the renovation of the nearly century-old sports facility, and Rice, who has worked for the Cubs since his high school days, provided an in-depth discussion of the history and evolution of the ballpark, from its days as Weeghman Park (1914) to the installation of lights (1988) and up to current plans for improvements to the electrical and structural systems.

They then led U40 participants on an hour-long tour of the park, from the bowels of the locker room to the heights of the upper deck.

The U40 Leadership Summit ended with a hot dog lunch at the Cubby Bear, a Wrigleyville sports and entertainment landmark.

Participants earned up to 11.0 AIA/CES Discovery learning units for attending all sessions.

Sponsors for the U40 Summit: Andersen Windows and Doors, the Vinyl Institute, SAGE Electrochromics, Georgia-Pacific, the American Institute of Steel Construction, and Sprint. +

Related Stories

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021