flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Under40 Leadership Summit draws 71 young leaders to Chicago

Under40 Leadership Summit draws 71 young leaders to Chicago

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”


By By Robert Cassidy | November 11, 2012
Dont touch the ivyits historic! The U40 Leadership Summit participants assemb
Dont touch the ivyits historic! The U40 Leadership Summit participants assembled before the 400-foot centerfield sign at Wrig
This article first appeared in the November 2012 issue of BD+C.

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”

That was the theme of Building Design+Construction’s Second Annual “Under40 Leadership Summit,” held October 3-5 in partnership with AIA Chicago. The program brought together past honorees in BD+C’s “40 Under 40” program with under-40 AEC professionals nominated by their respective firms for networking and interactive leadership development.

The two-and-a-half-day program got started Wednesday afternoon, October 3, with a two-hour tour of Chicago’s architectural heritage along the Chicago River. A docent from the Chicago Architecture Foundation provided an articulate commentary on more than 50 architectural treasures, including works by Harry Weese, Bertrand Goldberg, SOM, and Perkins+Will.

Later that evening, the U40 attendees assembled at the Hotel Monaco, where Autodesk Fellow Tom Wujec, the Summit’s principal facilitator, led them in “The Great Chicago Marshmallow Challenge.” Teams of three or four were given 20 sticks of spaghetti, a yard of tape, a yard of string, and a marshmallow. They had 18 minutes to erect the tallest structure they could, with the stipulation that the marshmallow had to be on top.

Several structures collapsed. Participants were surprised by how much the marshmallow weighed. The winning structure measured 29½ inches in height—about average, according to Wujec, but well short of the record (more than 50 inches). No marshmallows were eaten during the competition (it happens, Wujec says).

Thursday, October 4, was devoted entirely to Wujec’s “Create with Clarity” mobile workshop. Wujec started the group off with what seemed to be a simple exercise: without using words, visualize—through drawing—how to make toast.

Where they came from


The following organizations were represented at the U40 Leadership Summit:

Adrian Smith + Gordon Gill, Argonne National Laboratory, Arquitectonica, BSA LifeStructures, Contract Management Inc. Dewberry, DLR Group, Enclos – Advanced Technology Studio, G3 Construction Group, Gensler, Harley Ellis Devereaux, HDR Architecture, Heery International, Hill International, HKS Architects, HMC Architects, Hoar Program Management, HOK, Johnson Controls, KJWW Engineering Consultants, KLMK Group, Legat Architects, Montalba Architects, Mortenson, Niles Bolton Associates, Norcon Inc., O’Brien Construction, Pepper Construction, Perkins+Will, Playground Ideas, Reichgott Engineering, Rogers Krajnak Architects, roomTEN Design, Ryan Companies US, School of the Art Institute of Chicago, SmithGroupJJR, Solomon Cordwell Buenz, Swinerton Builders, Syska Hennessy Group, Tarlton Corporation, Tilton Kelly + Bell, TLC Engineering for Architecture, University of Illinois at Urbana-Champaign, UrbanWorks, Valerio Dewalt Train Associates, VOA Associates, Walker Parking Consultants, Walter P Moore & Associates, and Wight & Co.

Teams of six to eight then each took on a specific question related to their professional or personal lives. Among the topics: How do we grow our firm? How do we use technology more wisely? How do we balance the demands of work with the needs of our personal lives and families?

The teams then went out into the city—to the North Michigan Avenue “Magnificent Mile,” to the Lake Michigan lakefront, to Millennium Park. Their mission: to find inspiration that would help them present a visual representation of their question—and even a solution.

Upon their return, the teams engaged in extensive development of the oversize posters for their visual presentations, a couple of which also took the form of a skit. Final presentations were made in rapid order,

Wujec then led the entire group in a discussion of the meaning of the visualizations and how to apply the process and concepts learned in their daily work and personal lives.

To the Friendly Confines

Friday, October 5, opened with an early morning bus ride to Wrigley Field, home of the Chicago Cubs, where the group was greeted by Tom Ricketts, the team chairman, Steven J. Jacobsen, SCDP, President of Jacobsen Development Advisors, and Carl Rice, Vice President of Baseball Operations for the Cubs.

Jacobsen, who has been retained by the Cubs to create the business plan and high-level concepts for the renovation of the nearly century-old sports facility, and Rice, who has worked for the Cubs since his high school days, provided an in-depth discussion of the history and evolution of the ballpark, from its days as Weeghman Park (1914) to the installation of lights (1988) and up to current plans for improvements to the electrical and structural systems.

They then led U40 participants on an hour-long tour of the park, from the bowels of the locker room to the heights of the upper deck.

The U40 Leadership Summit ended with a hot dog lunch at the Cubby Bear, a Wrigleyville sports and entertainment landmark.

Participants earned up to 11.0 AIA/CES Discovery learning units for attending all sessions.

Sponsors for the U40 Summit: Andersen Windows and Doors, the Vinyl Institute, SAGE Electrochromics, Georgia-Pacific, the American Institute of Steel Construction, and Sprint. +

Related Stories

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021