More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”
That was the theme of Building Design+Construction’s Second Annual “Under40 Leadership Summit,” held October 3-5 in partnership with AIA Chicago. The program brought together past honorees in BD+C’s “40 Under 40” program with under-40 AEC professionals nominated by their respective firms for networking and interactive leadership development.
The two-and-a-half-day program got started Wednesday afternoon, October 3, with a two-hour tour of Chicago’s architectural heritage along the Chicago River. A docent from the Chicago Architecture Foundation provided an articulate commentary on more than 50 architectural treasures, including works by Harry Weese, Bertrand Goldberg, SOM, and Perkins+Will.
Later that evening, the U40 attendees assembled at the Hotel Monaco, where Autodesk Fellow Tom Wujec, the Summit’s principal facilitator, led them in “The Great Chicago Marshmallow Challenge.” Teams of three or four were given 20 sticks of spaghetti, a yard of tape, a yard of string, and a marshmallow. They had 18 minutes to erect the tallest structure they could, with the stipulation that the marshmallow had to be on top.
Several structures collapsed. Participants were surprised by how much the marshmallow weighed. The winning structure measured 29½ inches in height—about average, according to Wujec, but well short of the record (more than 50 inches). No marshmallows were eaten during the competition (it happens, Wujec says).
Thursday, October 4, was devoted entirely to Wujec’s “Create with Clarity” mobile workshop. Wujec started the group off with what seemed to be a simple exercise: without using words, visualize—through drawing—how to make toast.
Where they came from
The following organizations were represented at the U40 Leadership Summit:
Adrian Smith + Gordon Gill, Argonne National Laboratory, Arquitectonica, BSA LifeStructures, Contract Management Inc. Dewberry, DLR Group, Enclos – Advanced Technology Studio, G3 Construction Group, Gensler, Harley Ellis Devereaux, HDR Architecture, Heery International, Hill International, HKS Architects, HMC Architects, Hoar Program Management, HOK, Johnson Controls, KJWW Engineering Consultants, KLMK Group, Legat Architects, Montalba Architects, Mortenson, Niles Bolton Associates, Norcon Inc., O’Brien Construction, Pepper Construction, Perkins+Will, Playground Ideas, Reichgott Engineering, Rogers Krajnak Architects, roomTEN Design, Ryan Companies US, School of the Art Institute of Chicago, SmithGroupJJR, Solomon Cordwell Buenz, Swinerton Builders, Syska Hennessy Group, Tarlton Corporation, Tilton Kelly + Bell, TLC Engineering for Architecture, University of Illinois at Urbana-Champaign, UrbanWorks, Valerio Dewalt Train Associates, VOA Associates, Walker Parking Consultants, Walter P Moore & Associates, and Wight & Co.
Teams of six to eight then each took on a specific question related to their professional or personal lives. Among the topics: How do we grow our firm? How do we use technology more wisely? How do we balance the demands of work with the needs of our personal lives and families?
The teams then went out into the city—to the North Michigan Avenue “Magnificent Mile,” to the Lake Michigan lakefront, to Millennium Park. Their mission: to find inspiration that would help them present a visual representation of their question—and even a solution.
Upon their return, the teams engaged in extensive development of the oversize posters for their visual presentations, a couple of which also took the form of a skit. Final presentations were made in rapid order,
Wujec then led the entire group in a discussion of the meaning of the visualizations and how to apply the process and concepts learned in their daily work and personal lives.
To the Friendly Confines
Friday, October 5, opened with an early morning bus ride to Wrigley Field, home of the Chicago Cubs, where the group was greeted by Tom Ricketts, the team chairman, Steven J. Jacobsen, SCDP, President of Jacobsen Development Advisors, and Carl Rice, Vice President of Baseball Operations for the Cubs.
Jacobsen, who has been retained by the Cubs to create the business plan and high-level concepts for the renovation of the nearly century-old sports facility, and Rice, who has worked for the Cubs since his high school days, provided an in-depth discussion of the history and evolution of the ballpark, from its days as Weeghman Park (1914) to the installation of lights (1988) and up to current plans for improvements to the electrical and structural systems.
They then led U40 participants on an hour-long tour of the park, from the bowels of the locker room to the heights of the upper deck.
The U40 Leadership Summit ended with a hot dog lunch at the Cubby Bear, a Wrigleyville sports and entertainment landmark.
Participants earned up to 11.0 AIA/CES Discovery learning units for attending all sessions.
Sponsors for the U40 Summit: Andersen Windows and Doors, the Vinyl Institute, SAGE Electrochromics, Georgia-Pacific, the American Institute of Steel Construction, and Sprint. +
Related Stories
Healthcare Facilities | Jun 20, 2022
Is telehealth finally mainstream?
After more than a century of development, telehealth has become a standard alternative for many types of care.
Building Team | Jun 20, 2022
Andres Caballero Appointed President of Uponor North America
Uponor Corporation (Uponor) has named Andres Caballero president of its Building Solutions – North America division and a member of the Executive Committee at Uponor.
| Jun 20, 2022
An architectural view of school safety and security
With threats ranging from severe weather to active shooters, school leaders, designers, and security consultants face many challenges in creating safe environments that allow children to thrive.
School Construction | Jun 20, 2022
A charter high school breaks ground in L.A.’s Koreatown
A new charter school has broken ground in Los Angeles’ Koreatown neighborhood.
Building Team | Jun 17, 2022
Data analytics in design and construction: from confusion to clarity and the data-driven future
Data helps virtual design and construction (VDC) teams predict project risks and navigate change, which is especially vital in today’s fluctuating construction environment.
Sports and Recreational Facilities | Jun 17, 2022
U. of Georgia football facility expansion provides three floors for high-performance training
A major expansion of the University of Georgia’s football training facility has been completed.
Building Team | Jun 16, 2022
Hybrid work expected to reduce office demand by 9%
Businesses are slowly but consistently transitioning to a permanent hybrid work environment, according to a senior economist at Econometric Advisors.
Building Team | Jun 16, 2022
USGBC announces more than 23 million square feet of LEED certified net zero space
Today, the U.S. Green Building Council announced nearly 100 net zero certifications earned under the LEED Zero program, representing more than 23 million square feet of space.
AEC Business Innovation | Jun 15, 2022
Cognitive health takes center stage in the AEC industry
Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.
Market Data | Jun 15, 2022
ABC’s construction backlog rises in May; contractor confidence falters
Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to nine months in May from 8.8 months in April, according to an ABC member survey conducted May 17 to June 3. The reading is up one month from May 2021.