flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UMass Amherst’s Worcester Commons to be built on an existing parking lot

University Buildings

UMass Amherst’s Worcester Commons to be built on an existing parking lot

Shawmut, in partnership with Perry Dean Rogers and Connor Architecture, are designing the project.


By David Malone, Associate Editor | September 30, 2019
UMass Amherst worcester commons sidewalk view

All renderings courtesy Perry Dean Rogers.

Rising on the site of an existing parking lot, UMass Amherst’s new 87,000-sf Worcester Commons will provide the university and its students with a learning hub meant to enhance student life.

The $53 million project will highlight the university’s dining services and include a 1000-seat, all-you-can-eat dining space with 15 different global cuisines, a teaching kitchen, a ground-floor cafe, a commercial bakery, a grab-and-go market, and a new full-service restaurant concept on the top floor.

 

UMass Amherst's new Worcester Commons from the south

 

A “neighborhood center,” will comprise lounges, meeting and club rooms, collaboration spaces, music practice studios, and a fitness center. The site around the new complex will include the replacement of parking and loading spaces, outdoor gathering areas, and community spaces. 

 

See Also: A fresh start: upgrades and expansions mark new school year

 

Worcester Commons is located at the intersection of two main corridors of the campus and is targeting LEED Gold certification. Shawmut Design and Construction, in partnership with Perry Dean Rogers and Connor Architecture, will design and build the project.

 

UMass Amherst Worcester Commons

Related Stories

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

| Oct 17, 2011

Clery Act report reveals community colleges lacking integrated mass notification systems

  “Detailed Analysis of U.S. College and University Annual Clery Act Reports” study now available. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021