A long-awaited and contentious project in Meadowlands, N.J., may finally be on the way to completion.
Developer Triple Five Group has signed an agreement with the Bergen County Building and Construction Trades Council for the construction (or shall we say, "reconstruction") of the American Dream mall, the planned cost of which is about $2 billion.
In the end, the development is set to include a water park, an indoor ski slope, and a retail complex.
Governor Chris Christie was present at the signing of the agreement. He once called the development "the ugliest damn building in New Jersey, and maybe America," The Star-Ledger reports.
The American Dream was originally approved for construction in 2003, but has met many challenges along the way. Most recently, the New York Giants and the Jets sued to keep the mall closed on Sundays, citing concerns about traffic on game days. A settlement has been reached, though both sides have declined to disclose details.
Read the full story by The Star-Ledger here.
Related Stories
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.