flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

'Ugliest building in New Jersey' finally getting facelift

'Ugliest building in New Jersey' finally getting facelift

After a decade of false starts and mishaps, the American Dream mall in the Meadowlands may finally get built.


By BD+C Staff | May 6, 2014
The Triple Five Group has now signed an agreement with the Bergen County Buildin
The Triple Five Group has now signed an agreement with the Bergen County Building and Construction Trades Council for the comple

A long-awaited and contentious project in Meadowlands, N.J., may finally be on the way to completion.

Developer Triple Five Group has signed an agreement with the Bergen County Building and Construction Trades Council for the construction (or shall we say, "reconstruction") of the American Dream mall, the planned cost of which is about $2 billion.

In the end, the development is set to include a water park, an indoor ski slope, and a retail complex.

Governor Chris Christie was present at the signing of the agreement. He once called the development "the ugliest damn building in New Jersey, and maybe America," The Star-Ledger reports.

The American Dream was originally approved for construction in 2003, but has met many challenges along the way. Most recently, the New York Giants and the Jets sued to keep the mall closed on Sundays, citing concerns about traffic on game days. A settlement has been reached, though both sides have declined to disclose details. 

Read the full story by The Star-Ledger here.

Related Stories

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021