The new UCI Medical Center Irvine project is set to rise adjacent to the University California Irvine campus. The facility will be a short walk or bike ride for researchers, students, and staff.
UCI Medical Center will embrace UCI’s commitment to sustainable design and construction, incorporating recycled water in the central plant and for irrigation, green power, and the preservation of the San Joaquin Marsh Reserve. The marsh will provide views for patients and families and relaxing spaces for doctors, researchers, and staff. Other areas for gathering outdoors will include walkable pathways and healing gardens.
The campus will feature a 144-bed, 350,000-sf hospital that includes an emergency department, inpatient bed services, operating rooms, pre/post observation beds, inpatient imaging, and support services. It will also have a 200,000-sf ambulatory surgery center comprising outpatient surgery and procedure rooms, diagnostic and imaging services, oncology treatment and infusion facilities, clinical exam rooms, a pharmacy, and support services. Additional features will also include a 35,000-sf central energy plant to serve the campus and a 1,340-space parking structure.
UCI Medical Center Construction Completion Set for 2025
A design-build team comprising Hensel Phelps + CO Architects will design and construct the UCI Medical Center, which is slated to break ground in mid-2021. The parking structure will be complete in 2022. The ambulatory surgery center and central energy plant will complete in 2023. The entire hospital is expected for completion in 2025.
Related Stories
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +
| Aug 11, 2010
Call for entries: Building enclosure design awards
The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.
| Aug 11, 2010
Portland Cement Association offers blast resistant design guide for reinforced concrete structures
Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads. It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.
| Aug 11, 2010
AIA selects three projects for National Healthcare Design Awards
The American Institute of Architects (AIA) Academy of Architecture for Health (AAH) have selected the recipients of the AIA National Healthcare Design Awards program. The AIA Healthcare Awards program showcases the best of healthcare building design and healthcare design-oriented research. Projects exhibit conceptual strengths that solve aesthetic, civic, urban, and social concerns as well as the requisite functional and sustainability concerns of a hospital.
| Aug 11, 2010
Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report
A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
RSMeans/RCD forecast 14% drop in hospital construction for 2009
RSMeans forecasts a 14% drop in hospital construction in 2009 compared to 2008, with $17.1 billion in registered hospital projects as of June 30, 2009. The Reed Construction Data unit finds renovation of healthcare facilities increasing, from 36% of projects in 2008, to 40% of projects in the pipeline in the first six months of 2009.