flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UCI Medical Center Irvine to break ground in mid-2021

Healthcare Facilities

UCI Medical Center Irvine to break ground in mid-2021

Hensel Phelps + CO Architects design-build team were awarded the project.


By David Malone, Associate Editor | April 16, 2021
UCI Medical Center exterior

Renderings courtesy CO Architects

The new UCI Medical Center Irvine project is set to rise adjacent to the University California Irvine campus. The facility will be a short walk or bike ride for researchers, students, and staff.

UCI Medical Center will embrace UCI’s commitment to sustainable design and construction, incorporating recycled water in the central plant and for irrigation, green power, and the preservation of the San Joaquin Marsh Reserve. The marsh will provide views for patients and families and relaxing spaces for doctors, researchers, and staff. Other areas for gathering outdoors will include walkable pathways and healing gardens.

 

UCI Medical Center lobby

 

The campus will feature a 144-bed, 350,000-sf hospital that includes an emergency department, inpatient bed services, operating rooms, pre/post observation beds, inpatient imaging, and support services. It will also have a 200,000-sf ambulatory surgery center comprising outpatient surgery and procedure rooms, diagnostic and imaging services, oncology treatment and infusion facilities, clinical exam rooms, a pharmacy, and support services. Additional features will also include a 35,000-sf central energy plant to serve the campus and a 1,340-space parking structure.

UCI Medical Center Construction Completion Set for 2025

A design-build team comprising Hensel Phelps + CO Architects will design and construct the UCI Medical Center, which is slated to break ground in mid-2021. The parking structure will be complete in 2022. The ambulatory surgery center and central energy plant will complete in 2023. The entire hospital is expected for completion in 2025.

 

UCI Medical Center patient drop off

 

UCI Medical Center hospital dining area

 

UCI Medical Center view from the marsh

Related Stories

| Jul 30, 2013

Healthcare designers and builders, beware: the ‘Obamacare’ clock is ticking down to midnight [2013 Giants 300 Report]

Hard to believe, but we’re only six months away from when the Affordable Care Act will usher in a radical transformation of the American healthcare system. Healthcare operators are scrambling to decipher what the new law will mean to their bottom lines and capital facility budgets.

| Jul 30, 2013

Top Healthcare Sector Construction Firms [2013 Giants 300 Report]

Turner, McCarthy, Clark Group top Building Design+Construction's 2013 ranking of the largest healthcare contractors and construction management firms in the U.S. 

| Jul 30, 2013

Top Healthcare Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Jacobs, URS top Building Design+Construction's 2013 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 23, 2013

Tell us how you're reimagining the medical office building

"Obamacare" implementation will add thousands of people to the ranks of the insured, including many who formerly sought primary care in emergency rooms. Now, these patients will have coverage that allows them to more easily access the typical treatment channels—and that means greater demand for services provided in medical office buildings.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 18, 2013

Do third-corridor designs actually work for healthcare environments?

A recent study of a nursing unit assessed whether the space's third corridor does what it was intended to do: reduce noise and distraction to patients and nursing staff. 

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021