flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U of M installs new lighting at Crisler Player Development Center

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.


By By BD+C Staff | January 24, 2012
Fifty-six Induction High Bay fixtures manufactured by EverLast Lighting were installed during construction of the university's s

The University of Michigan's basketball team is shooting for a Big Ten title and a long NCAA Tournament run this season. While the Wolverines continue to rack up victories in games, EverLast Lighting could get credited with an assist for helping them on the practice court.

Fifty-six Induction High Bay fixtures manufactured by EverLast Lighting were installed during construction of the university's state-of-the-art Player Development Center, which is attached to Crisler Arena, where Michigan plays its home games. The Player Development Center, which opened in October, is 57,000 square feet and was built at a cost of more than $23 million.

The color rendering index, or CRI, measures how something appears under a certain type of lighting. Lights with a higher CRI give their users increased visual acuity, which means objects are sharper and more defined. EverLast fixtures provide a higher CRI than other lighting options, which benefits members of the University of Michigan men's and women's basketball teams during practice at the facility. BD+C

Related Stories

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 9, 2012

2012 Giants 300 survey due Friday, April 13

See how your firm ranks among the AEC industry leaders. 

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021