Thornton Tomasetti, the international engineering firm, announces that two projects for which it provided structural engineering services – Palazzo Lombardia in Milan, Italy, and the Solar Canopy/EV Dock in Chicago, Ill. – have received the coveted International Architecture Awards. The projects were among 80 chosen for the honor.
The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.
The 40-story Palazzo Lombardia is the tallest building in Italy upon its completion in 2011. The building serves as headquarters for the Lombardy Regional Government. Thornton Tomasetti provided structural engineering services to Pei Cobb Freed and Partners.
Palazzo Lombardia includes a nine-story curvilinear podium composed of six independent buildings separated by expansion joints, and a large public plaza enclosed by an arched tubular lamella roof clad with an ETFE pillow membrane.
The Solar Canopy/EV Dock, a prototype structure completed in 2011, is designed to harvest solar energy for powering electric/hybrid vehicles. The dock is used by the City of Chicago to charge its stock of cars.
Thornton Tomasetti was responsible for the structural design and detailing of steel and connections for Adrian Smith + Gordon Gill Architecture. The 11-foot tall structure has a steel superstructure and concrete foundation with a 300-SF canopy. Attached photovoltaic panels provide space for two cars. The unit can function singularly or linked with other canopies. +
Related Stories
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.