flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two Rivers Marketing: Industrial connection

Two Rivers Marketing: Industrial connection

Creativity turned disaster into a dream come true for an Iowa marketing firm, with the reconstruction of an old General Motors parts warehouse.


By Maggie Koerth-Baker | August 11, 2010
This article first appeared in the 200610 issue of BD+C.



It was supposed to be the perfect new office. In July 2003, Two Rivers Marketing Group of Des Moines, Iowa, began working with Shiffler Associates Architects on a 14,000-sf building to house their rapidly growing marketing firm. Over the next six months they put together an innovative program that drew on unprecedented amounts of employee feedback. Construction kicked off in June 2004; by December, their dream office was close to being reality.

PHOTOS: CAMERON CAMPBELL

Then, on December 20, 2004, the virtually complete building caught fire and burned to the ground, leaving Two Rivers Marketing with a soon-to-expire lease and no place to go.

In the aftermath of the fire, the Building Team—Shiffler Associates Architects, with Larson & Larson Construction (GC), The Waldinger Group (M/E engineer), and Korpela Engineering (structural)—came to realize that the fire was something of a mixed blessing: the burnt-out space wouldn't have met the client's needs for long in any case. In six years, the staff had grown from 14 to 60 employees, and the marketing firm was hiring like mad. Clearly, finding a new building to renovate with enough room for expansion was top priority.

Three months later, they found the right place—32,000 sf of steel and glass. Originally constructed in 1935, this former General Motors parts warehouse offered sweeping views of the Iowa State Capitol building and downtown Des Moines. With all square footage on one large floor, the warehouse gave Two Rivers Marketing the opportunity to arrange their staff in an open configuration that separated people by distance, rather than walls, and encouraged collaboration between designers, writers, and account managers.

The firm also felt that the industrial space offered a symbolic connection to their clients—largely industrial-based companies like Bobcat and Ingersoll Rand—in a way that a stuffy, marble-and-mahogany environment would not. Nor did it hurt, given the firm's recent history, that the warehouse was made entirely of noncombustible materials.

Simple, inexpensive materials were used throughout the interior spaces. The main lobby is clad with plywood panels (top) and semi-transparent corrugated fi berglass walls enclose the mezzanine workspaces (above).
PHOTOS: CAMERON CAMPBELL

With Two Rivers Marketing's lease set to run out at the end of 2005, the design-build team had nine months to not only repair 70 years' worth of lapsed maintenance, but also to transform a raw warehouse into the ideal office space for a fun, hip marketing firm.

The first step was quickly coming up with an architectural program and design that would fit the space. Luckily, the team was able to use the program from the original, burnt-out building. To make the program fit the much larger space, they added a photo studio, a larger break area, and plenty of office room that would allow the company to grow.

Then came the job of updating and repairing the shell of the building to meet codes and energy-efficiency needs. The building's windows—steel sash and single pane, many with concrete sills that had come loose from the masonry below—needed serious work. The team reset all the windows and doweled them into place, replacing the old panes with aluminum frames and insulated glazing. The HVAC system, which at purchase consisted of multiple ceiling-hung furnaces, was replaced with more effective rooftop units.

With the basics taken care of, the team could then move on to aesthetics. In order to build a brand connection with their industrial clientele, Two Rivers chose to maintain the look and feel of the original GM structure. The original concrete floor was polished to a bright sheen. The trim materials used for desks, wall details, and the few dividing walls were chosen for both their industrial character and their ability to maintain a sense of openness. These included plywood and inexpensive corrugated fiberglass panels.

But the team's greatest achievement was the addition of a mezzanine into the building's pre-existing central clerestory. Adding 3,000 sf of extra space, the mezzanine is self-supporting and appears to float on narrow, canted columns. It is divided into a series of “pseudo rooms,” defined enough to give the firm's executives private offices, but tied to the rest of the design's open layout by semi-transparent corrugated fiberglass walls set with open plywood window boxes.

The industrial theme is maintained here, too, by walkways made of steel grating and wire mesh guardrails that reference back to old-fashioned factory catwalks. The space beneath the mezzanine is designed to be an impromptu meeting place, with couches and chair groupings that encourage brainstorming sessions.

Completed last December, the project has won several preservation and design awards. Two Rivers Marketing continues to draw in more new employees, possibly as a result of another renovation element—a full kitchen complete with keg fridge and pool table.

Related Stories

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

| Oct 11, 2011

Onex completes investment in JELD-WEN

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021