flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two Ohio engineering firms, Tec and Monks, merge

Engineers

Two Ohio engineering firms, Tec and Monks, merge

Both companies offer mechanical, electrical, plumbing engineering services.


By BD+C Editors | May 10, 2016

Columbus, Ohio. Photo: Ron Reiring/Wikimedia Commons.

Two Ohio engineering firms announced a merger.

On Monday, Columbus-based W.E. Monks & Co. Engineers officially became a part of Tec Inc. Engineering & Design, a firm the Cleveland suburb of Eastlake.

Tec and Monks both offer mechanical, electrical, plumbing (MEP) engineering services to similar markets like healthcare, industrial sectors, and higher education. 

“This merger is a strong strategic fit for both firms, as it gives us a bigger, better toolkit of engineering resources to offer our clients,” Tec president Terry Kilbourne said in a statement. “Monks’ professionals are highly experienced, and they bring great expertise and depth to Tec’s existing practices. Both firms share a common goal to exceed our clients’ expectations, and this merger positions us to do that better than before.” 

Monks will house Tec’s Columbus office, which has 10 of Tec’s 27 total engineers. Russ Edwards, the president of W.E. Monks, will become the Managing Principal of Tec’s Columbus office. Monks will operate as a subsidiary of Tec until the integration is complete.

Founded in 1983, Tec’s largest national project is the 750,000-sf Spire Institute in Geneva, Ohio, an $80 million athletic complex. The company is licensed to operate in 40 states.

Monks has provided consulting engineering services since 1960.

Tags

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021