flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two Ohio engineering firms, Tec and Monks, merge

Engineers

Two Ohio engineering firms, Tec and Monks, merge

Both companies offer mechanical, electrical, plumbing engineering services.


By BD+C Editors | May 10, 2016

Columbus, Ohio. Photo: Ron Reiring/Wikimedia Commons.

Two Ohio engineering firms announced a merger.

On Monday, Columbus-based W.E. Monks & Co. Engineers officially became a part of Tec Inc. Engineering & Design, a firm the Cleveland suburb of Eastlake.

Tec and Monks both offer mechanical, electrical, plumbing (MEP) engineering services to similar markets like healthcare, industrial sectors, and higher education. 

“This merger is a strong strategic fit for both firms, as it gives us a bigger, better toolkit of engineering resources to offer our clients,” Tec president Terry Kilbourne said in a statement. “Monks’ professionals are highly experienced, and they bring great expertise and depth to Tec’s existing practices. Both firms share a common goal to exceed our clients’ expectations, and this merger positions us to do that better than before.” 

Monks will house Tec’s Columbus office, which has 10 of Tec’s 27 total engineers. Russ Edwards, the president of W.E. Monks, will become the Managing Principal of Tec’s Columbus office. Monks will operate as a subsidiary of Tec until the integration is complete.

Founded in 1983, Tec’s largest national project is the 750,000-sf Spire Institute in Geneva, Ohio, an $80 million athletic complex. The company is licensed to operate in 40 states.

Monks has provided consulting engineering services since 1960.

Tags

Related Stories

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021