Two Ohio engineering firms announced a merger.
On Monday, Columbus-based W.E. Monks & Co. Engineers officially became a part of Tec Inc. Engineering & Design, a firm the Cleveland suburb of Eastlake.
Tec and Monks both offer mechanical, electrical, plumbing (MEP) engineering services to similar markets like healthcare, industrial sectors, and higher education.
“This merger is a strong strategic fit for both firms, as it gives us a bigger, better toolkit of engineering resources to offer our clients,” Tec president Terry Kilbourne said in a statement. “Monks’ professionals are highly experienced, and they bring great expertise and depth to Tec’s existing practices. Both firms share a common goal to exceed our clients’ expectations, and this merger positions us to do that better than before.”
Monks will house Tec’s Columbus office, which has 10 of Tec’s 27 total engineers. Russ Edwards, the president of W.E. Monks, will become the Managing Principal of Tec’s Columbus office. Monks will operate as a subsidiary of Tec until the integration is complete.
Founded in 1983, Tec’s largest national project is the 750,000-sf Spire Institute in Geneva, Ohio, an $80 million athletic complex. The company is licensed to operate in 40 states.
Monks has provided consulting engineering services since 1960.
Related Stories
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.
| May 23, 2012
Gifford joins Perkins Eastman as principal
Design and planning expertise in science, technology, education, and healthcare.
| May 23, 2012
McRitchie joins McCarthy Building as VP, commercial services in southern California
McRitchie brings more than 18 years of experience in the California construction marketplace.
| May 23, 2012
Arizona Army National Guard Readiness Center awarded LEED Silver
LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.
| May 23, 2012
New hospitals invest in data centers to manage growth in patient info
Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| May 22, 2012
Batson-Cook names Partin VP of Business Development
Partin joins general contractor from Georgia Hospital Association.
| May 22, 2012
Casaccio Architects and GYA Architects join to form Casaccio Yu Architects
Architects Lee A. Casaccio, AIA, LEED AP, and George Yu, AIA, share leadership of the new firm.
| May 22, 2012
O’Connell Robertson acquires Mitchell Design Consultancy
Mary Ann A. Mitchell, AIA, IIDA, MDC principal and founder, joins O’Connell Robertson as part of the acquisition.