Two Ohio engineering firms announced a merger.
On Monday, Columbus-based W.E. Monks & Co. Engineers officially became a part of Tec Inc. Engineering & Design, a firm the Cleveland suburb of Eastlake.
Tec and Monks both offer mechanical, electrical, plumbing (MEP) engineering services to similar markets like healthcare, industrial sectors, and higher education.
“This merger is a strong strategic fit for both firms, as it gives us a bigger, better toolkit of engineering resources to offer our clients,” Tec president Terry Kilbourne said in a statement. “Monks’ professionals are highly experienced, and they bring great expertise and depth to Tec’s existing practices. Both firms share a common goal to exceed our clients’ expectations, and this merger positions us to do that better than before.”
Monks will house Tec’s Columbus office, which has 10 of Tec’s 27 total engineers. Russ Edwards, the president of W.E. Monks, will become the Managing Principal of Tec’s Columbus office. Monks will operate as a subsidiary of Tec until the integration is complete.
Founded in 1983, Tec’s largest national project is the 750,000-sf Spire Institute in Geneva, Ohio, an $80 million athletic complex. The company is licensed to operate in 40 states.
Monks has provided consulting engineering services since 1960.
Related Stories
| Sep 17, 2013
Jacobs announces merger agreement with Sinclair Knight Merz
Jacobs Engineering Group has entered into a merger implementation agreement with Sinclair Knight Merz, a 6,500-person professional services firm headquartered in Australia.
| Sep 17, 2013
SMPS Foundation announces new business development research book
The SMPS Foundation has released its latest research book, A/E/C BUSINESS DEVELOPMENT – The Decade Ahead.
| Sep 17, 2013
Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention
Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.
| Sep 17, 2013
AIA sees uptick in architecture billings for August
AIA's Architecture Billings Index was 53.8 in August, up from 52.7 the previous month, signaling increased demand for design services nationwide. The West and Northeast regions saw the biggest ABI gains last month.
| Sep 17, 2013
First look: BIG+MVVA proposal for Pier 6 at Brooklyn Bridge Park
BIG’s proposal for Brooklyn Bridge Park, a project that has revitalized the New York City waterfront, consists of a 6,000 ft2 (560 m2) triangular cross-laminated timber structure, serving both as pavilion and platform. Sloping upwards 17.5 feet (5.3 m) in height from the foot of the large gathering lawn, the platform provides magnificent views of the surrounding harbor, the Statue of Liberty, the Manhattan skyline, and the Brooklyn Bridge.
| Sep 17, 2013
World's first 'invisible' tower planned in South Korea
The 1,476-foot-tall structure will showcase Korean cloaking technology that utilizes an LED façade fitted with optical cameras that will display the landscape directly behind the building, thus making it invisible.
| Sep 17, 2013
Complex stained glass restoration under way on Wisconsin Capitol Building
Work is under way at the Wisconsin State Capitol on an extensive $2.7 million, 14-month renovation to the skylights above the House and Senate chambers, along with the barrel vault skyline above the grand staircase and the panels in the rotunda dome.
| Sep 16, 2013
Study analyzes effectiveness of reflective ceilings
Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.
| Sep 16, 2013
Does brainstorming work?
The idea-generating process known as brainstorming has come under some intense fire recently. Critics contend that it suspends much-needed criticism and conflict while suppressing the creative ideas of introverts.
| Sep 16, 2013
Passive solar, enhanced envelope crucial to Univ. of Illinois net-zero project
Passive solar strategies and an enhanced envelope are keys to achieving net-zero on the new 230,000 sf Department of Electrical and Computer Engineering building at the University of Illinois at Urbana-Champaign.