flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two myths regarding NFPA 101 Life Safety Code debunked

Codes and Standards

Two myths regarding NFPA 101 Life Safety Code debunked

NFPA life safety engineer Ron Coté settles the debate over second egress doors and exit signs.


By Peter Fabris, Contributing Editor | June 18, 2015
Two myths regarding NFPA 101 Life Safety Code debunked

Image: Pixabay

In Compliance column in the May/June issue of NFPA Journal, Ron Coté, Principal Life Safety Engineer at the National Fire Protection Agency, debunks two myths regarding NFPA 101, Life Safety Code.

The first myth is that all assembly occupancy rooms with an occupancy load more than 50 must have a second egress door. This is not true, although many do have second exit access doors “in order not to violate the common path of travel limitation,” Coté writes.

For most room locations and arrangements, a second exit access door from the room can be positioned to provide occupants with a second travel path. The presence of the second exit access door can reduce what would otherwise be an excessive common path of travel to one that is within the permitted distance.

Coté also debunks the myth that exit signs are required at exits only. The signs are actually required in three locations: at exits, in the exit access, and in exit access corridors of new construction. They are required in the exit access when the exit or way to reach the exit is not readily apparent, as might be the case where additional turns in the egress path are needed to reach an exit.

They may also be needed when in exit access corridors of new construction no point is in excess of the particular sign’s rated viewing distance or the 100-foot (30-meter) default value, whichever is less, from the nearest sign.

Related Stories

| Jan 30, 2012

Roofer’s fatal plunge demonstrates need for fall-prevention regulations

“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.

| Jan 26, 2012

Tampa moves to streamlined online permitting system

The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.

| Jan 26, 2012

EPA to collect more data, seek comments before finalizing mud rule

The EPA says it will seek more data and is accepting comments until March 5.

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

| Jan 18, 2012

Report analyzes residential hurricane codes in 18 states

The Insurance Institute for Business & Home Safety (IBHS) released a new report analyzing residential building codes in 18 hurricane-prone coastal states along the Gulf of Mexico and the Atlantic Coast.

| Jan 18, 2012

Death in Chicago high-rise apartment fire blamed on fire code

The death of a Chicago woman who stepped off her elevator into a blazing inferno last week has underscored the need for fire sensors in elevators.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021