flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two myths regarding NFPA 101 Life Safety Code debunked

Codes and Standards

Two myths regarding NFPA 101 Life Safety Code debunked

NFPA life safety engineer Ron Coté settles the debate over second egress doors and exit signs.


By Peter Fabris, Contributing Editor | June 18, 2015
Two myths regarding NFPA 101 Life Safety Code debunked

Image: Pixabay

In Compliance column in the May/June issue of NFPA Journal, Ron Coté, Principal Life Safety Engineer at the National Fire Protection Agency, debunks two myths regarding NFPA 101, Life Safety Code.

The first myth is that all assembly occupancy rooms with an occupancy load more than 50 must have a second egress door. This is not true, although many do have second exit access doors “in order not to violate the common path of travel limitation,” Coté writes.

For most room locations and arrangements, a second exit access door from the room can be positioned to provide occupants with a second travel path. The presence of the second exit access door can reduce what would otherwise be an excessive common path of travel to one that is within the permitted distance.

Coté also debunks the myth that exit signs are required at exits only. The signs are actually required in three locations: at exits, in the exit access, and in exit access corridors of new construction. They are required in the exit access when the exit or way to reach the exit is not readily apparent, as might be the case where additional turns in the egress path are needed to reach an exit.

They may also be needed when in exit access corridors of new construction no point is in excess of the particular sign’s rated viewing distance or the 100-foot (30-meter) default value, whichever is less, from the nearest sign.

Related Stories

Codes and Standards | Oct 16, 2015

Anchorage may raise building height restrictions that would block precious winter sunlight

Controversial measure is part of plan to spur development.

Codes and Standards | Oct 9, 2015

New California law means commercial building benchmarking program will be implemented

Multifamily housing to be included, a first for a U.S. state.

Codes and Standards | Oct 2, 2015

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.

Codes and Standards | Sep 18, 2015

New RELi standard addresses disaster resilience

Based on LEED model, may help lower insurance rates  

Building Materials | Aug 28, 2015

Structural steel buildings specification available for second public review

Next year's specification open for comments until Sept. 21

Energy Efficiency | Aug 28, 2015

North American Passive House Network e-book explains Passivhaus, net-zero techniques

Free guide includes spotlight on individual projects

Windows and Doors | Aug 28, 2015

Newly formed group challenges Florida building code

Window, door companies oppose provisions that raise costs

Codes and Standards | Aug 28, 2015

New Orleans becoming a model for climate resilience only 10 years after Katrina

The city has moved ahead with resilience strategies that may become a model for other communities

Codes and Standards | Aug 21, 2015

Illinois governor vetoes bill that would restrict condo owners’ rights

Bill would have made it harder to sue for building flaws

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021