flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two myths regarding NFPA 101 Life Safety Code debunked

Codes and Standards

Two myths regarding NFPA 101 Life Safety Code debunked

NFPA life safety engineer Ron Coté settles the debate over second egress doors and exit signs.


By Peter Fabris, Contributing Editor | June 18, 2015
Two myths regarding NFPA 101 Life Safety Code debunked

Image: Pixabay

In Compliance column in the May/June issue of NFPA Journal, Ron Coté, Principal Life Safety Engineer at the National Fire Protection Agency, debunks two myths regarding NFPA 101, Life Safety Code.

The first myth is that all assembly occupancy rooms with an occupancy load more than 50 must have a second egress door. This is not true, although many do have second exit access doors “in order not to violate the common path of travel limitation,” Coté writes.

For most room locations and arrangements, a second exit access door from the room can be positioned to provide occupants with a second travel path. The presence of the second exit access door can reduce what would otherwise be an excessive common path of travel to one that is within the permitted distance.

Coté also debunks the myth that exit signs are required at exits only. The signs are actually required in three locations: at exits, in the exit access, and in exit access corridors of new construction. They are required in the exit access when the exit or way to reach the exit is not readily apparent, as might be the case where additional turns in the egress path are needed to reach an exit.

They may also be needed when in exit access corridors of new construction no point is in excess of the particular sign’s rated viewing distance or the 100-foot (30-meter) default value, whichever is less, from the nearest sign.

Related Stories

Codes and Standards | May 9, 2016

EcoDistricts unveils sustainable neighborhood framework

Focus is on equity, resilience, and climate protection.  

School Construction | May 3, 2016

Florida clamps down on school construction spending

Critics fear rules will hamper ability to build schools with desired features.  

Resiliency | May 2, 2016

Connecticut to develop new code standards for resiliency

Expected more frequent severe weather events due to climate change prompts review.  

Contractors | Apr 29, 2016

OSHA issues advisory to protect workers from Zika virus

Construction industry workers considered at high risk.  

Codes and Standards | Apr 28, 2016

New research finds 30 measures to significantly cut energy use

ASHRAE’s prescription cuts across all building types and climates.  

Codes and Standards | Apr 27, 2016

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.  

Codes and Standards | Apr 25, 2016

San Francisco becomes first big U.S. city to require solar panels on new buildings

Pertains to commercial and residential buildings shorter than 10 stories.  

Codes and Standards | Apr 25, 2016

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.  

Wood | Apr 22, 2016

Revised 2015 Manual for Engineered Wood Construction available

American Wood Council Document offers design information for structural applications.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021