flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two myths regarding NFPA 101 Life Safety Code debunked

Codes and Standards

Two myths regarding NFPA 101 Life Safety Code debunked

NFPA life safety engineer Ron Coté settles the debate over second egress doors and exit signs.


By Peter Fabris, Contributing Editor | June 18, 2015
Two myths regarding NFPA 101 Life Safety Code debunked

Image: Pixabay

In Compliance column in the May/June issue of NFPA Journal, Ron Coté, Principal Life Safety Engineer at the National Fire Protection Agency, debunks two myths regarding NFPA 101, Life Safety Code.

The first myth is that all assembly occupancy rooms with an occupancy load more than 50 must have a second egress door. This is not true, although many do have second exit access doors “in order not to violate the common path of travel limitation,” Coté writes.

For most room locations and arrangements, a second exit access door from the room can be positioned to provide occupants with a second travel path. The presence of the second exit access door can reduce what would otherwise be an excessive common path of travel to one that is within the permitted distance.

Coté also debunks the myth that exit signs are required at exits only. The signs are actually required in three locations: at exits, in the exit access, and in exit access corridors of new construction. They are required in the exit access when the exit or way to reach the exit is not readily apparent, as might be the case where additional turns in the egress path are needed to reach an exit.

They may also be needed when in exit access corridors of new construction no point is in excess of the particular sign’s rated viewing distance or the 100-foot (30-meter) default value, whichever is less, from the nearest sign.

Related Stories

Codes and Standards | Feb 2, 2018

How workplace design can position financial services companies for success

HOK report examines forces reshaping industry.

Codes and Standards | Jan 31, 2018

California is the first state to phase out incandescent light bulbs

In two years, the rest of the U.S. will follow suit.

Codes and Standards | Jan 31, 2018

Automated tool assists in design of force transfer around openings

Engineered Wood Assn. offers free calculator and technical note.

Codes and Standards | Jan 31, 2018

First large-scale use of perovskite solar cells in office building slated for Poland this year

Skanska will integrate the technology into building facades.

Codes and Standards | Jan 29, 2018

Advanced Energy Design Guide for K-12 Schools to achieve zero energy

Publication is joint effort by ASHRAE, AIA, IES, and USGBC.

Codes and Standards | Jan 26, 2018

Flying drones while inebriated now illegal in New Jersey

Violators could be sentenced to six months in jail.

Codes and Standards | Jan 25, 2018

OSHA penalties for violations increase

Fines adjusted for inflation in the New Year.

Codes and Standards | Jan 23, 2018

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.

Codes and Standards | Jan 19, 2018

U.S. construction fatalities rose 6% in 2016

Falls accounted for 39% of deadly accidents.

Codes and Standards | Jan 18, 2018

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021