flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two myths regarding NFPA 101 Life Safety Code debunked

Codes and Standards

Two myths regarding NFPA 101 Life Safety Code debunked

NFPA life safety engineer Ron Coté settles the debate over second egress doors and exit signs.


By Peter Fabris, Contributing Editor | June 18, 2015
Two myths regarding NFPA 101 Life Safety Code debunked

Image: Pixabay

In Compliance column in the May/June issue of NFPA Journal, Ron Coté, Principal Life Safety Engineer at the National Fire Protection Agency, debunks two myths regarding NFPA 101, Life Safety Code.

The first myth is that all assembly occupancy rooms with an occupancy load more than 50 must have a second egress door. This is not true, although many do have second exit access doors “in order not to violate the common path of travel limitation,” Coté writes.

For most room locations and arrangements, a second exit access door from the room can be positioned to provide occupants with a second travel path. The presence of the second exit access door can reduce what would otherwise be an excessive common path of travel to one that is within the permitted distance.

Coté also debunks the myth that exit signs are required at exits only. The signs are actually required in three locations: at exits, in the exit access, and in exit access corridors of new construction. They are required in the exit access when the exit or way to reach the exit is not readily apparent, as might be the case where additional turns in the egress path are needed to reach an exit.

They may also be needed when in exit access corridors of new construction no point is in excess of the particular sign’s rated viewing distance or the 100-foot (30-meter) default value, whichever is less, from the nearest sign.

Related Stories

Codes and Standards | Jul 17, 2018

In many markets, green features are more of a requirement for apartment renters

Renters in many U.S. cities have come to expect green features in apartments that they rent, with an eye toward energy efficiency and healthy indoor air.

Codes and Standards | Jul 12, 2018

Developer says net zero Salt Lake City apartment high-rise built at standard cost

Off-site solar, and mechanical/electrical system savings aid the achievement.

Codes and Standards | Jul 11, 2018

D.C. local worker requirement not being met

Government doing little to verify self-reported project data.

Codes and Standards | Jul 10, 2018

Carbon emissions in cement production threaten GHG reduction goals

Cement is essential to many infrastructure projects that address climate change.

Codes and Standards | Jul 10, 2018

DOE’s Better Buildings Summit to be held in Cleveland, August 21-23

Agenda includes technical training and networking opportunities.

Codes and Standards | Jul 6, 2018

Delos and HDR will co-develop wellness design tools and collaborate on research

WELL Building Standard pioneer teams with architects to advance wellness innovations in the built environment.

Codes and Standards | Jul 5, 2018

BREEAM New Construction standard launched in U.S.

Follows successful launch of BREEAM In-Use standard.

Codes and Standards | Jun 29, 2018

Nearly half of nonresidential construction projects now delivered by design-build

‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021