flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two buildings or three?

Sponsored Content Metals

Two buildings or three?

The exterior of the Trane office has a dramatic look.


By Star Building Systems | January 5, 2018

TJK Design Build, Inc. of Madison, WI is a company that prides itself on innovative design and outside-the-box approaches to architectural challenges. They frequently build with Star Buildings – often in situations where a metal building is not the usual choice – because TJK has learned that Star is willing to turn their unusual ideas into reality.

The Trane sales office in Madison, WI is a good example. The entire building has a footprint slightly over 10,000 sf. There was no requirement for the kind of broad clear-span area that often drives the decision to use a metal building system. In fact, the modest overall size is actually divided into three sections, and structurally framed as three metal building systems joined together.

According to TJK president Tim Kritter, they chose to make this project a Star metal building for three reasons: cost effectiveness, speed of construction (specifically in relation to the onset of winter), and a flexibility of design afforded by working with Star, which Kritter describes as rare in the industry.

 

 

The layout of the building consists of a low-roofed central section with two taller ‘wing’ buildings on either side. (The rising rooflines of the two sides make that term seem more-than-usually appropriate.) The west wing is largely composed of smaller private offices for the sales force. The east wing is a large, open bullpen-type office. The center has the conference room, break room, other common space, and mechanical rooms. Trane HVAC units on the roof of the center section serve all three parts of the building.

The exterior of the Trane office has a dramatic look. The soaring roofs are extended into projection canopies – overhangs five feet long around the sides and 2 feet long at the roof peaks – that help shield the many windows from direct sun. Tim Kritter points out that the aesthetic contribution of overhangs was just as important to the project as solar shading. “They create shadow lines, and give it significant interest.”   

The two side-buildings are clad in two colors of AVP 26 ga. metal wall panels, Medium Bronze and Colonial Red. The center section’s exterior is dominated by glazing, surrounded by Trespa panels in colors matching the AVP panels.

 

 

If the look of the Trane office is innovative, the structural system that achieves it is probably even more unusual. It could be considered as structurally three buildings, if you look at the rafters. However, it is supported on the number of columns you would expect for two buildings. The center section’s rafters have no columns of their own. They piggyback onto the inner columns of the two wings, supported by means of brackets welded onto the columns. This unusual approach saved on steel and erection time. 

Kritter also emphasizes that by using a metal building, they were able to meet a significant challenge in timing. Site work and concrete foundations were begun in October, enabling them to complete concreting before freezing conditions became an issue. This allowed them to have the metal structural frame delivered and erected in December. Because they were able to enclose the building early in the winter, they could work indoors through the rest of the winter to finish the project.  

 

 

Kritter is enthusiastic about using metal building systems from Star, and reports that it works out advantageously for his company and his customers, even on small projects. 

“Star works very, very well with us, allowing us to create these unique shapes and uses, and create enough architectural interest to use a metal building,” comments Kritter. “There are a lot of pre-engineered building manufacturers out there, but we like the ease of creating ideas using Star’s design software. Some metal building manufacturers are just dinosaurs, but Star is willing to allow us to design our building and incorporate elements of architecture back into their system. They’re so good at that, it’s one of the reasons we continue to work with Star.”

Tags

Related Stories

| Apr 17, 2014

6 details that can throw off your schedule

In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Reflecting on job number 61-001

Job number 61-001 changed everything. It was sold in 1961, a year of change for the nation and for Star. By January, John F. Kennedy would be president. By the end of the year, Star would launch a historic shift in our product and our distribution, a shift still active today.

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 11, 2014

Why you should start with a builder, part three

We had worked together for 30 years. As a long-standing client of mine, he and I had gone through many projects together. And we were approaching another project, one that would forever change how he viewed our working relationship. As my customer and I sat down to talk about the project details, he told me something that would stay with me for weeks. “Kim, I’m going to have to get other bids on this just so I have peace of mind.”

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Mar 4, 2014

CENTRIA Demonstrates Commitment to Contractors

New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience

| Feb 27, 2014

Colorado Coalition Plans Welcoming Events for METALCON International Visitors

Visitors to the 24th METALCON International, slated for October 1-3 at the Colorado Convention Center in Denver, will get a royal welcome from local companies involved in the show. Denver-based New Tech Machinery and Colorado Springs-based S-5! Solutions have formed the Colorado Coalition as a way of encouraging visitors to learn about Colorado before they arrive and for Coloradans to experience METALCON.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021