Tutor Perini Corp., a civil and building construction company, has begun a companywide adoption of Textura Corp.'s Prequalification Management (Textura–PQM) system. Tutor Perini is utilizing Textura—PQM to collect all prequalification data and attachments. A standardized prequalification form and process will facilitate subcontractor prequalification and deliver significant efficiencies and improved risk management.
Bill Sparks, Tutor Perini's Executive Vice President, Treasurer, and Corporate Secretary, said, "In today's marketplace and as a requirement of our insurance program there is an increased emphasis on the selection and management of our subcontracting process. We have established uniform corporate guidelines for the administration of this program. We selected Textura's Prequalification Management system to be the backbone of our subcontractor prequalification process. PQM will allow us to maintain an on-going qualified status with our thousands of subcontractors in markets across the United States."
Textura's flexible PQM tool will create a shared process for all business units while still allowing local offices to customize requirements to unique conditions in local markets. The business units will continue to make all subcontractor selection decisions – but PQM will allow them to spend more time reviewing qualifications and less time gathering data.
"We are extremely pleased to add Tutor Perini Corp. to our fast-growing PQM client base," said Patrick Allin, Chairman and CEO of Textura. "They are a top 10 GC with operations and a strong reputation throughout the U.S. and around the world. The rigorous selection process they went through to pick PQM ensures a good fit with their prequalification program. Tutor Perini will benefit from an automated, robust prequalification process. Our clients are using PQM to help them achieve more effective prequalification programs."
Tutor Perini selected Textura—PQM after a detailed analysis of the available prequalification solutions on the market, including existing bid management systems and ERP packages which have a prequalification module.
Roger Donley, Tutor Perini's Corporate Director Risk Management, said, "Tutor Perini's requirements for a prequalification system were fairly simple: 1) Minimize labor and resource requirements within the business units; 2) Create a consistent process and workflow that can be utilized by all business units; and 3) The product should be an online service that allows for secured and centralized access to data by all involved."
Textura—PQM will provide for easier, more efficient data collection and improved access to subcontractor prequalification information across the Tutor Perini organization. It helps mitigate risk by providing a collaborative solution that facilitates electronic submission, review, and updating of all prequalification documents. +
Related Stories
| Nov 4, 2011
McCarthy completes construction of South Region High School No. 2 in Los Angeles
Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.
| Nov 4, 2011
Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards
Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.
| Nov 3, 2011
GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa
The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.
| Nov 3, 2011
Hardin Construction tops out Orlando Embassy Suites
The project began in April 2011 and is expected to open in fall 2012.
| Nov 3, 2011
2012 Pritzker Architecture Prize Ceremony to be held in China
The tradition of moving the event to world sites of architectural significance was established to emphasize that the prize is international, the laureates having been chosen from 16 different nations to date.
| Nov 3, 2011
DMR Architects welcomes two new staff members
Siro Gonzalez joins the staff as junior graduate architect and Megan Byers joins the staff as marketing assistant.
| Nov 2, 2011
Mega deals drive 28% increase in global engineering and construction merger and acquisition value
Financial investors lead mega deal activity, China most active country in global domestic deals.
| Nov 2, 2011
Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.
307,000-sf building to be house to executive offices of Biogen Idec.
| Nov 2, 2011
CRSI’s Manual of Standard Practice now available
This resource contains information on recommended industry practices for estimating, detailing, fabricating, and placing reinforcing steel for reinforced concrete construction.