Tutor Perini Corp., a civil and building construction company, has begun a companywide adoption of Textura Corp.'s Prequalification Management (Textura–PQM) system. Tutor Perini is utilizing Textura—PQM to collect all prequalification data and attachments. A standardized prequalification form and process will facilitate subcontractor prequalification and deliver significant efficiencies and improved risk management.
Bill Sparks, Tutor Perini's Executive Vice President, Treasurer, and Corporate Secretary, said, "In today's marketplace and as a requirement of our insurance program there is an increased emphasis on the selection and management of our subcontracting process. We have established uniform corporate guidelines for the administration of this program. We selected Textura's Prequalification Management system to be the backbone of our subcontractor prequalification process. PQM will allow us to maintain an on-going qualified status with our thousands of subcontractors in markets across the United States."
Textura's flexible PQM tool will create a shared process for all business units while still allowing local offices to customize requirements to unique conditions in local markets. The business units will continue to make all subcontractor selection decisions – but PQM will allow them to spend more time reviewing qualifications and less time gathering data.
"We are extremely pleased to add Tutor Perini Corp. to our fast-growing PQM client base," said Patrick Allin, Chairman and CEO of Textura. "They are a top 10 GC with operations and a strong reputation throughout the U.S. and around the world. The rigorous selection process they went through to pick PQM ensures a good fit with their prequalification program. Tutor Perini will benefit from an automated, robust prequalification process. Our clients are using PQM to help them achieve more effective prequalification programs."
Tutor Perini selected Textura—PQM after a detailed analysis of the available prequalification solutions on the market, including existing bid management systems and ERP packages which have a prequalification module.
Roger Donley, Tutor Perini's Corporate Director Risk Management, said, "Tutor Perini's requirements for a prequalification system were fairly simple: 1) Minimize labor and resource requirements within the business units; 2) Create a consistent process and workflow that can be utilized by all business units; and 3) The product should be an online service that allows for secured and centralized access to data by all involved."
Textura—PQM will provide for easier, more efficient data collection and improved access to subcontractor prequalification information across the Tutor Perini organization. It helps mitigate risk by providing a collaborative solution that facilitates electronic submission, review, and updating of all prequalification documents. +
Related Stories
| Nov 17, 2014
A new BSL-3 public-safety lab debuts in Vermont
The laboratory will be used to perform a wide range of analyses to detect biological, toxicological, chemical, and radiological threats to the health of the population, from testing for rabies, West Nile, pertussis and salmonella to water and food contaminants.
| Nov 17, 2014
Workplace pilot programs: A new tool for creating workspaces employees love
In a recent article for Fast Company, CannonDesign's Meg Osman details how insurance giant Zurich used a workplace pilot program to empower its employees in the creation of its new North American headquarters.
| Nov 17, 2014
Mastering natural ventilation: 5 crucial lessons from design experts
By harnessing natural ventilation, Building Teams can achieve a tremendous reduction in energy use and increase in occupant comfort. Engineers from SOM offer lessons from the firm’s recent work.
| Nov 14, 2014
Bjarke Ingels unveils master plan for Smithsonian's south mall campus
The centerpiece of the proposed plan is the revitalization of the iconic Smithsonian castle.
| Nov 14, 2014
What college students want in their living spaces
In a recent workshop with 62 college students, architects from Little explored the changing habits and preferences of today's students, and how those changes affect their living spaces.
Sponsored | | Nov 12, 2014
Eye-popping façade highlights renovation, addition at Chaffin Junior High School
The new distinctive main entrance accentuates the public face of the school with an aluminum tube “baguette” system.
Sponsored | | Nov 12, 2014
Williams Scotsman plugs into the jobsite
Many of our customers conduct important business from their temporary modular jobsite office and most require access to technology to get their job done effectively and efficiently. SPONSORED CONTENT
| Nov 12, 2014
Chesapeake Bay Foundation completes uber-green Brock Environmental Center, targets Living Building certification
More than a decade after opening its groundbreaking Philip Merrill Environmental Center, the group is back at it with a structure designed to be net-zero water, net-zero energy, and net-zero waste.
| Nov 12, 2014
Forbes: Houston is America's #1 construction hotspot
A new list of America's 20 biggest boomtowns shows Houston on top, with New York City close behind, followed by Dallas, Washington, D.C., and Los Angeles.
| Nov 11, 2014
Renzo Piano's third building at London Bridge Quarter approved, will be built adjacent to the Shard
Renzo Piano Building Workshop has been granted planning approval for its residential building at London Bridge Quarter—a 26-story apartment tower dubbed Feilden House.