flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tutor Perini Corp. to Implement Textura Prequalification Management Companywide

Tutor Perini Corp. to Implement Textura Prequalification Management Companywide

Rollout across the Tutor Perini organization will enhance the subcontractor prequalification experience and enable a standardized process in support of the contractor default insurance program.


By Posted by Raissa Rocha, Associate Editor | January 29, 2013

Tutor Perini Corp., a civil and building construction company, has begun a companywide adoption of Textura Corp.'s Prequalification Management (Textura–PQM) system. Tutor Perini is utilizing Textura—PQM to collect all prequalification data and attachments.  A standardized prequalification form and process will facilitate subcontractor prequalification and deliver significant efficiencies and improved risk management.

Bill Sparks, Tutor Perini's Executive Vice President, Treasurer, and Corporate Secretary, said, "In today's marketplace and as a requirement of our insurance program there is an increased emphasis on the selection and management of our subcontracting process. We have established uniform corporate guidelines for the administration of this program. We selected Textura's Prequalification Management system to be the backbone of our subcontractor prequalification process.  PQM will allow us to maintain an on-going qualified status with our thousands of subcontractors in markets across the United States."

Textura's flexible PQM tool will create a shared process for all business units while still allowing local offices to customize requirements to unique conditions in local markets.  The business units will continue to make all subcontractor selection decisions – but PQM will allow them to spend more time reviewing qualifications and less time gathering data.

"We are extremely pleased to add Tutor Perini Corp. to our fast-growing PQM client base," said Patrick Allin, Chairman and CEO of Textura.  "They are a top 10 GC with operations and a strong reputation throughout the U.S. and around the world.  The rigorous selection process they went through to pick PQM ensures a good fit with their prequalification program. Tutor Perini will benefit from an automated, robust prequalification process. Our clients are using PQM to help them achieve more effective prequalification programs." 

Tutor Perini selected Textura—PQM after a detailed analysis of the available prequalification solutions on the market, including existing bid management systems and ERP packages which have a prequalification module. 

Roger Donley, Tutor Perini's Corporate Director Risk Management, said, "Tutor Perini's requirements for a prequalification system were fairly simple: 1) Minimize labor and resource requirements within the business units; 2) Create a consistent process and workflow that can be utilized by all business units; and 3) The product should be an online service that allows for secured and centralized access to data by all involved."

Textura—PQM will provide for easier, more efficient data collection and improved access to subcontractor prequalification information across the Tutor Perini organization. It helps mitigate risk by providing a collaborative solution that facilitates electronic submission, review, and updating of all prequalification documents. +

Related Stories

| Jan 21, 2015

Tesla Motors starts construction on $5 billion battery plant in Nevada

Tesla Motors’ “gigafactory,” a $5 billion project on 980 acres in Sparks, Nev., could annually produce enough power for 500,000 electric cars.

| Jan 20, 2015

Daring hotel design scheme takes the shape of cut amethyst stone

The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside. 

| Jan 20, 2015

Avery Associates unveils plans for London's second-tallest tower

The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.

| Jan 19, 2015

HAO unveils designs for a 3D movie museum in China

New York-based HAO has released designs for the proposed Bolong 3D Movie Museum & Mediatek in Tianjin.

| Jan 19, 2015

Gaudi’s first work outside Spain will be a chapel in Chile

Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.

| Jan 19, 2015

Architecture for Humanity closes office, plans to file for bankruptcy

After more than 15 years of work, the nonprofit design group Architecture for Humanity has closed its San Francisco office and plans to file for Chapter 7 bankruptcy protection.

| Jan 17, 2015

When is a train station not a train station? When it’s a performance venue

You can catch a train at Minneapolis’s new Target Field Station. You can also share in an experience. That’s what ‘Open Transit’ is all about.

| Jan 16, 2015

Artsy lifeguard stations will brighten Toronto’s snowy beach

Five winning designs have been unveiled for lifeguard stands that will double as public space art installations on Toronto's beach.

| Jan 16, 2015

New York City construction costs continue to climb

A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years.

| Jan 15, 2015

A reconstructed Taliesin West is the largest Frank Lloyd Wright LEGO Model [slideshow]

Artist Adam Reed Tucker used 180,000 LEGO pieces and 420 hours of work to recreate Frank Lloyd Wright's Taliesin West campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021