Tutor Perini Corp., a civil and building construction company, has begun a companywide adoption of Textura Corp.'s Prequalification Management (Textura–PQM) system. Tutor Perini is utilizing Textura—PQM to collect all prequalification data and attachments. A standardized prequalification form and process will facilitate subcontractor prequalification and deliver significant efficiencies and improved risk management.
Bill Sparks, Tutor Perini's Executive Vice President, Treasurer, and Corporate Secretary, said, "In today's marketplace and as a requirement of our insurance program there is an increased emphasis on the selection and management of our subcontracting process. We have established uniform corporate guidelines for the administration of this program. We selected Textura's Prequalification Management system to be the backbone of our subcontractor prequalification process. PQM will allow us to maintain an on-going qualified status with our thousands of subcontractors in markets across the United States."
Textura's flexible PQM tool will create a shared process for all business units while still allowing local offices to customize requirements to unique conditions in local markets. The business units will continue to make all subcontractor selection decisions – but PQM will allow them to spend more time reviewing qualifications and less time gathering data.
"We are extremely pleased to add Tutor Perini Corp. to our fast-growing PQM client base," said Patrick Allin, Chairman and CEO of Textura. "They are a top 10 GC with operations and a strong reputation throughout the U.S. and around the world. The rigorous selection process they went through to pick PQM ensures a good fit with their prequalification program. Tutor Perini will benefit from an automated, robust prequalification process. Our clients are using PQM to help them achieve more effective prequalification programs."
Tutor Perini selected Textura—PQM after a detailed analysis of the available prequalification solutions on the market, including existing bid management systems and ERP packages which have a prequalification module.
Roger Donley, Tutor Perini's Corporate Director Risk Management, said, "Tutor Perini's requirements for a prequalification system were fairly simple: 1) Minimize labor and resource requirements within the business units; 2) Create a consistent process and workflow that can be utilized by all business units; and 3) The product should be an online service that allows for secured and centralized access to data by all involved."
Textura—PQM will provide for easier, more efficient data collection and improved access to subcontractor prequalification information across the Tutor Perini organization. It helps mitigate risk by providing a collaborative solution that facilitates electronic submission, review, and updating of all prequalification documents. +
Related Stories
Giants 400 | Aug 28, 2019
Top 45 Data Center Construction Firms for 2019
Whiting-Turner, Turner, Holder, DPR, and Fortis top the rankings of the nation's largest data center sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.
AEC Innovators | Aug 27, 2019
7 AEC industry disruptors and their groundbreaking achievements
From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.
Giants 400 | Aug 16, 2019
2019 Healthcare Giants Report: The ‘smart hospital’ is on the horizon
These buildings perform functions like a medical practitioner. This and more healthcare sector trends from Building Design+Construction's 2019 Giants 300 Report.
AEC Innovators | Aug 15, 2019
Oracle’s replica of a construction jobsite creates an immersive environment for AEC professionals
The Oracle Construction and Engineering Innovation Lab allows visitors to walk through five different stages of construction work, to test new AEC technologies and training techniques.
Giants 400 | Aug 13, 2019
2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings
The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.
Giants 400 | Aug 8, 2019
Top 110 Office Sector Construction Firms for 2019
Turner, STO Building Group, AECOM, Clayco, and Clark lead the rankings of the nation's largest office sector contractors and construction managers, as reported in Building Design+Construction's 2019 Giants 300 Report.
Giants 400 | Aug 8, 2019
2019 Office Giants Report: Demand for exceptional workplaces will keep the office construction market strong
Office space consolidation and workplace upgrades will keep project teams busy, according to BD+C's 2019 Giants 300 Report.
Museums | Jul 29, 2019
A new museum debuts inside the Empire State Building
A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.
Multifamily Housing | Jul 23, 2019
Is prefab in your future?
The most important benefit of offsite construction, when done right, is reliability.
Healthcare Facilities | Jul 15, 2019
Can a kids’ healthcare space teach, entertain, and heal?
Standard building requirements don’t have to be boring. Here’s how you can inject whimsical touches into everyday design features.