flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

Sports and Recreational Facilities

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.


By Mike Chamernik, Associate Editor | July 18, 2016

The new stadium and mixed-use project for the Los Angeles Rams. Renderings courtesy LA Rams.

Turner Construction and AECOM have been selected by Hollywood Park Land Company to build the new stadium and mixed-use project for the Los Angeles Rams in Inglewood, Calif.

Designed by HKS Architects, the Rams’ new 70,000-seat home is slated to have 275 luxury suites and 16,000 premium seats. It will also have room for 27,000 standing spectators and three million sf of usable space. 

The surrounding Hollywood Park entertainment district will truly be considered mixed-use. It will be designed to have a 6,000-seat performance center; 890,000 sf of retail space; 780,000 sf of office space; 300 hotel rooms; 2,500 residential units; and 25 acres of parks and playgrounds. The entire project will sit on a 298-acre site and could cost upwards of $3 billion. 

 

 

Turner, one of the nation's largest construction management companies, and AECOM, a multinational engineering firm, are both Giants in the sports AEC world. Between them, they have built 17 NFL stadiums and renovated 10 others. Turner was involved with the construction of the San Francisco 49ers’ Levi’s Stadium and the renovations to Lambeau Field, the home of the Green Bay Packers. AECOM was part of the teams that built the Seattle Seahawks’ CenturyLink Field and that led the renovations to the New Orleans Saints’ Mercedes-Benz Superdome. Most recently, Turner was the GC and AECOM was the architect of the Golden 1 Center, the Sacramento Kings’ new basketball arena that will open this fall.

“After a competitive review of a number of outstanding construction firms, we have hired the best team to build the largest and most technologically advanced sports stadium in the world for the Los Angeles Rams,” Terry Fancher, president of the Hollywood Park Land Co., said in a statement.

Turner and AECOM will join a Building Team already consisting of HKS, Legends Project Development (project management services) and Wilson Meany of San Francisco (entitlement and infrastructure management).

The Rams’ stadium is expected to open in time for the 2019 NFL season. In the meantime, the team will play at the 93-year-old, 90,000-seat L.A. Coliseum. 

The upcoming season will be the first year back on the West Coast for the Rams. They played in Los Angeles from 1946 to 1994, and were based in St. Louis from 1995 through last season. Stan Kroenke, the owner of the entities that control both the Rams and the Hollywood Park Land Company, engineered the move to LA over the last few years, starting with the purchase of the 60 acres of land in Inglewood back in 2014.

Two other NFL teams, the San Diego Chargers and the Oakland Raiders, both could still move to Los Angeles and share the new stadium with the Rams. The Chargers are working out a new stadium deal with their city, and the Raiders are considering plans for both Oakland and Las Vegas.

Related Stories

Sports and Recreational Facilities | Dec 17, 2018

Qatar unveils Lusail Stadium for 2022 FIFA World Cup

The stadium will be at the center of an entirely new city.

Sports and Recreational Facilities | Dec 6, 2018

Rec centers proliferate as community hubs

Taxpayers and other investors accept the economic and social value in these complexes.

Sports and Recreational Facilities | Oct 30, 2018

Florida’s tallest building could begin construction next spring

SkyRise Miami to offer some hair-raising attractions.

Giants 400 | Oct 12, 2018

Sports venues reach outside their walls

Professional and collegiate facilities invite fans to engage with the community.

Sports and Recreational Facilities | Aug 9, 2018

Populous-designed Buffalo Bills training center expansion will begin construction this fall

Arc Building Partners will lead construction efforts on the project.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Sports and Recreational Facilities | Apr 19, 2018

Watch a time-lapse of Wrigley Field’s most recent phase of renovations

The renovations took place between October 2017 and April 2018.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021