flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Turn rooftops into revenue generators with solar arrays

Codes and Standards

Turn rooftops into revenue generators with solar arrays

Lease or ownership models for PVs make more sense than ever.


By Peter Fabris, Contributing Editor | November 4, 2020

Courtesy Pixabay

The benefits of installing solar arrays on the rooftops of commercial buildings continue to grow.

Reduced hard costs due to falling prices, along with a more favorable regulatory environment, have magnified potential income from rooftop solar. The most common financial arrangement has been for the property owner to own the solar system, pay for the installation, and use the energy generated by the system to offset utility costs via net metering.

Another option is a solar site lease model. The owner of the property leases roof space to an experienced solar developer that finances and owns the solar array. The owner of the property makes money from rooftop lease payments—typically for 20+ years.

A similar option to solar site leases is a Power Purchase Agreement (PPA), in which the property owner signs a contract to purchase electricity generated by the array at rates below the utility retail rate. The solar developer pays for the system and uses the roof space at no cost.

Beyond such direct financial benefits, rooftop solar can help properties achieve compliance with ever more stringent environmental regulations. For example, some jurisdictions have passed laws that will penalize buildings that have not taken steps to reduce their carbon emissions.

Related Stories

| Nov 9, 2012

Higher bar on LEED may not be harder to reach

The U.S. Green Building Council expects to substantially revise LEED next year, requiring builders beginning in 2015 to take new and more-detailed steps to get buildings certified.

| Nov 9, 2012

CSI’s sustainability practice group offers webinar on EPA's WaterSense Program

The Construction Specification Institute’s sustainability practice group is offering a webinar Nov. 20 on EPA’s WaterSense Program, featuring Lynn Gilleland, drinking water specialist with EPA’s New England office.

| Nov 9, 2012

Mayor in Calif. wants to expedite permits for $1B worth of projects

The mayor of San Jose, Calif., plans to issue new construction permits worth an estimated $1 billion in the next six months to spur job creation and create revenue for the city.

| Nov 9, 2012

Jury awards N.Y. roofer $2 million for injuries after construction site fall

A roofing worker from Cortland County, N.Y., has been awarded $2 million in damages due to the injuries he sustained from a 60-foot fall at a dormitory construction site.

| Oct 31, 2012

Investigators look into crane severely damaged by Sandy in Manhattan

Investigators are examining a construction crane collapse atop a $1.5 billion luxury high-rise in midtown Manhattan due to high winds during Hurricane Sandy.

| Oct 31, 2012

Construction error suspected in Miami-Dade College garage collapse

A construction error is the chief suspect in the partial collapse of a parking garage at Miami-Dade College in Doral, FL.

| Oct 31, 2012

New European laws on timber will go into effect in March 2013

A new European Union timber regulation prohibits the “placing on the market of illegally harvested timber or timber products derived from such timber.”

| Oct 31, 2012

MIT models show roofs' capacity for solar energy in Cambridge, Mass.

A new mapping tool from the Massachusetts Institute of Technology and a Boston design firm can calculate rooftops' capacity for solar energy.

| Oct 31, 2012

Demand for living roofs, walls to reach $7.7 billion by 2017

The demand for green roofs and living walls is expected to climb from $5.3 billion in 2011 to $7.7 billion in 2017, according to a report from Lux Research.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021