flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

Codes and Standards

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

May limit the number of firms that could compete for contracts.


By Peter Fabris, Contributing Editor | January 7, 2021

Courtesy Pixabay

President Trump may be about to leave office, but his policies on the design of federal buildings are likely to be felt for at least a few more years.

Trump signed an executive order setting a new standard for federal architecture on Dec. 21. The edict denounces modernism and promotes classical design for federal buildings.

Trump also appointed four new appointees to the U.S. Commission on Fine Arts, the independent federal agency that oversees design and aesthetic decisions in Washington, D.C. All of the new commissioners are steeped in classical European sensibilities. Trump also appointed another classical architect to the National Capital Planning Commission, another Washington, D.C., oversight body.

Trump’s executive order will open federal procurement possibilities for stylistically conservative architects who might not win bids on their own merits otherwise, according to an article at Bloomberg.com. It could be a boon for the relatively small number of firms that specialize in classical design, and reduce opportunities for federal contracts for other firms, the report said.

Related Stories

Codes and Standards | Sep 17, 2019

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year.

Codes and Standards | Sep 13, 2019

Researchers use U. of Arkansas buildings as testbed for CLT panels

Investigation could influence future use of the materials.

Codes and Standards | Sep 13, 2019

At least 30 U.S. cities have adopted stricter building energy codes since 2017

Some followed their states in implementing more robust standards.

Codes and Standards | Sep 12, 2019

Illinois law sets maximum retainage on private projects

The change is expected to give contractors bigger checks earlier in project timeline.

Codes and Standards | Sep 10, 2019

Retreat may be the best option for some coastal communities in face of sea level rise

A new study makes the case for relocating in a "strategic, managed" manner.

Codes and Standards | Sep 9, 2019

Free app calculates maximum allowable heights and areas for buildings

A free app that calculates the maximum allowable heights and areas for buildings of various occupancy classifications and types of construction has been released.

Codes and Standards | Sep 6, 2019

Standard for assessing frame deflection using one component polyurethane foams updated

The standard offers guidance when installing fenestration products.

Codes and Standards | Aug 29, 2019

The high cost of gridlock: $166 billion per year

Growing economy means more jobs, more cars, more hours stuck in traffic.

Codes and Standards | Aug 29, 2019

Industry leaders ask for government help as trades shortage worsens

AGC asks for more funding for education and increased immigration to fill gaps.

Codes and Standards | Aug 29, 2019

Code-conforming wood design guide available

The guide summarizes provisions for the use of wood and wood products in the 2018 IBC.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021