flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trump infrastructure task force suggests arbitration to speed projects

Codes and Standards

Trump infrastructure task force suggests arbitration to speed projects

Permitting process could be reduced from 10 years to 2 years under the proposal.


By Peter Fabris, Contributing Editor | April 12, 2017

Pixabay Public Domain

Infrastructure projects in the United States can take as long as 10 years to obtain all necessary permits after all issues, including environmental impacts, are addressed.

To speed up permitting, President Donald Trump's infrastructure task force has suggested using the bankruptcy court arbitration process as a model for a revamped approach. Developer Richard LeFrak, who serves on the task force, said under this model one person would be the final word on all project issues, like an arbitrator in bankruptcy cases.

LeFrak told Reuters that the advisory council is proposing a pilot program that would reduce red tape and halt litigation on infrastructure projects. The process would not allow developers to avoid environmental compliance, but would allow differences and objections to be addressed and resolved faster.

Australia, Canada, and Germany typically take two years to approve infrastructure projects compared with 10 years in the United States, LeFrak said.

Related Stories

Codes and Standards | Sep 16, 2016

Calm weather tidal flooding impacting several communities on East and Gulf Coasts

Local officials face the prospect of costly mitigation projects.

Codes and Standards | Sep 15, 2016

OSHA appoints new director for its construction directorate

The forty-year industry veteran has been a GC and business owner.

Energy | Sep 13, 2016

Oberlin College to hold conference on post-fossil fuel economy

The gathering will address climate change and new sources of energy.

Industry Research | Sep 12, 2016

Evidence linking classroom design to improved learning mounts

A study finds the impact can be as much as 25% per year.

Legislation | Sep 8, 2016

Half of U.S. states now allow design-build on public projects

Missouri is the latest to enact design-build legislation.

Codes and Standards | Sep 8, 2016

Vapor intrusion risk addressed in new ASTM guide update

The updates address industry confusion over how to handle the issue.

BIM and Information Technology | Sep 7, 2016

Energy Star Portfolio Manager tool updated to factor in waste management

The costs and benefits of managing 29 types of waste are now included.

Wood | Sep 6, 2016

Atlanta suburb prohibits wood-framed construction for high rises

The new building code prevents any structure with more than three stories from being built from a CLT frame.

Codes and Standards | Sep 1, 2016

Overuse of air conditioning hurts office productivity

A study found temperatures in the low 70s reduce worker performance.

Regulations | Aug 31, 2016

FEMA wants to toughen flood regulation on projects using federal funds

The proposal ‘would essentially rewrite the current 100-year flood standard.’

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021