flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

'This merger is a dream for me,' said Frank Gehry of the deal. Financial terms were not disclosed.


By Trimble | September 8, 2014
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Re
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Rendering: courtesy Gehry Technologies

Trimble and Frank Gehry announced today that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies. 

As part of the alliance, Trimble has acquired Gehry Technologies, the software and consulting services business that has been instrumental in delivering Frank Gehry’s visionary designs while keeping cost and schedule in line for his clients.

The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently. 

"This merger is a dream for me. In Trimble, we find a partner who has like-minded ambitions and goals to create efficiencies in the AEC industry that allow the creativity of the architectural profession to flourish and deliver value-added creative solutions within the realities of our economic times. I am very excited to expand our mission with a great new partner," said Frank Gehry.  

“We are honored to enter into an association with Frank,” said Steven W. Berglund, president and CEO of Trimble. “His unique architectural vision has always challenged the conventional. Equally impactful are his views on the potential for transforming the entire design-build-operate continuum. Gehry Technologies has been key in allowing Frank to realize the potential of his designs without compromising cost or schedule. Together, we expect that our common commitment and our combined capabilities will accelerate the adoption of technology in this trillion-dollar industry with resulting breakout benefits. We are delighted with the prospect of working with Frank as he continues his strong personal advocacy for change in the construction industry.” 

Based in Los Angeles, Calif., Gehry Technologies is an AEC technology company that provides design and project management solutions, consulting services and project collaboration software tools. Gehry Technologies solutions include GTeam™ software, a Web-based 3D file management and project collaboration platform, building information modeling (BIM) technology as well as advanced project delivery services for leading owners, architects, engineers, builders, fabricators and industry professionals worldwide. The solutions allow customers of all sizes to communicate more effectively, improve design and construction quality, and accelerate project cycle times.

Gehry Technologies’ consulting services aid in the design, execution and management of the build environment. With a globally distributed team of architects, engineers, builders and computer scientists, the company delivers solutions that define and optimize project delivery processes and tools, enabling creative architecture with integrated engineering, high-precision fabrication and assembly, and improved risk management.

The combination of Gehry Technologies solutions and professional services with Trimble’s broad technology portfolio in positioning, BIM, analytics and visualization, automated machine guidance and real-time telematics accelerates total lifecycle solutions that will allow architects, engineers, contractors and owners to access data captured during the building planning, design, construction and renovation phases, providing deeper insight, better operating decisions and better asset performance.

Gehry Technologies will be reported in Trimble's Engineering and Construction Segment. Financial terms were not disclosed.

Related Stories

Multifamily Housing | Nov 22, 2022

10 compelling multifamily developments debut in 2022

A smart home tech-focused apartment complex in North Phoenix, Ariz., and a factory conversion to lofts in St. Louis highlight the notable multifamily developments to debut recently.

Digital Twin | Nov 21, 2022

An inside look at the airport industry's plan to develop a digital twin guidebook

Zoë Fisher, AIA explores how design strategies are changing the way we deliver and design projects in the post-pandemic world.

Healthcare Facilities | Nov 17, 2022

Repetitive, hotel-like design gives wings to rehab hospital chain’s rapid growth

The prototype design for Everest Rehabilitation Hospitals had to be universal enough so it could be replicated to accommodate Everest’s expansion strategy.

Industrial Facilities | Nov 16, 2022

Industrial building sector construction, while healthy, might also be flattening

For all the hoopla about the ecommerce boom and “last mile” order fulfillment driving demand for more warehouse and manufacturing space, construction of industrial buildings actually declined over the past five years, albeit marginally by 2.1% to $27.3 billion in 2022, according to estimates by IBIS World. Still, construction in this sector remains buzzy.

Wood | Nov 16, 2022

5 steps to using mass timber in multifamily housing

A design-assist approach can provide the most effective delivery method for multifamily housing projects using mass timber as the primary building element.

Giants 400 | Nov 14, 2022

Top 55 Airport Terminal Architecture + AE Firms for 2022

Gensler, PGAL, Corgan, and HOK top the ranking of the nation's largest airport terminal architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

Giants 400 | Nov 14, 2022

4 emerging trends from BD+C's 2022 Giants 400 Report

Regenerative design, cognitive health, and jobsite robotics highlight the top trends from the 519 design and construction firms that participated in BD+C's 2022 Giants 400 Report.

Green | Nov 13, 2022

NREL report: Using photovoltaic modules with longer lifetimes is a better option than recycling

A new report from the U.S. National Renewable Energy Laboratory (NREL) says PV module lifetime extensions should be prioritized over closed-loop recycling to reduce demand for new materials.

Green | Nov 13, 2022

Global building emissions reached record levels in 2021

Carbon-dioxide emissions from building construction and operations hit an all-time high in 2021, according to the most recent data compiled by the Global Alliance for Buildings and Construction.

University Buildings | Nov 13, 2022

University of Washington opens mass timber business school building

Founders Hall at the University of Washington Foster School of Business, the first mass timber building at Seattle campus of Univ. of Washington, was recently completed. The 84,800-sf building creates a new hub for community, entrepreneurship, and innovation, according the project’s design architect LMN Architects.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021