flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

'This merger is a dream for me,' said Frank Gehry of the deal. Financial terms were not disclosed.


By Trimble | September 8, 2014
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Re
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Rendering: courtesy Gehry Technologies

Trimble and Frank Gehry announced today that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies. 

As part of the alliance, Trimble has acquired Gehry Technologies, the software and consulting services business that has been instrumental in delivering Frank Gehry’s visionary designs while keeping cost and schedule in line for his clients.

The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently. 

"This merger is a dream for me. In Trimble, we find a partner who has like-minded ambitions and goals to create efficiencies in the AEC industry that allow the creativity of the architectural profession to flourish and deliver value-added creative solutions within the realities of our economic times. I am very excited to expand our mission with a great new partner," said Frank Gehry.  

“We are honored to enter into an association with Frank,” said Steven W. Berglund, president and CEO of Trimble. “His unique architectural vision has always challenged the conventional. Equally impactful are his views on the potential for transforming the entire design-build-operate continuum. Gehry Technologies has been key in allowing Frank to realize the potential of his designs without compromising cost or schedule. Together, we expect that our common commitment and our combined capabilities will accelerate the adoption of technology in this trillion-dollar industry with resulting breakout benefits. We are delighted with the prospect of working with Frank as he continues his strong personal advocacy for change in the construction industry.” 

Based in Los Angeles, Calif., Gehry Technologies is an AEC technology company that provides design and project management solutions, consulting services and project collaboration software tools. Gehry Technologies solutions include GTeam™ software, a Web-based 3D file management and project collaboration platform, building information modeling (BIM) technology as well as advanced project delivery services for leading owners, architects, engineers, builders, fabricators and industry professionals worldwide. The solutions allow customers of all sizes to communicate more effectively, improve design and construction quality, and accelerate project cycle times.

Gehry Technologies’ consulting services aid in the design, execution and management of the build environment. With a globally distributed team of architects, engineers, builders and computer scientists, the company delivers solutions that define and optimize project delivery processes and tools, enabling creative architecture with integrated engineering, high-precision fabrication and assembly, and improved risk management.

The combination of Gehry Technologies solutions and professional services with Trimble’s broad technology portfolio in positioning, BIM, analytics and visualization, automated machine guidance and real-time telematics accelerates total lifecycle solutions that will allow architects, engineers, contractors and owners to access data captured during the building planning, design, construction and renovation phases, providing deeper insight, better operating decisions and better asset performance.

Gehry Technologies will be reported in Trimble's Engineering and Construction Segment. Financial terms were not disclosed.

Related Stories

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

Higher Education | Jun 14, 2023

Designing higher education facilities without knowing the end users

A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.

Resiliency | Jun 14, 2023

HUD offers $4.8 billion in funding for green and resilient building retrofit projects

The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.

Arenas | Jun 14, 2023

A multipurpose arena helps revitalize a historic African American community in Georgia

In Savannah, Ga., Enmarket Arena, a multipurpose arena that opened last year, has helped revitalize the city’s historic Canal District—home to a largely African American community that has been historically separated from the rest of downtown.

Building Materials | Jun 14, 2023

Construction input prices fall 0.6% in May 2023

Construction input prices fell 0.6% in May compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices declined 0.5% for the month.

Mass Timber | Jun 13, 2023

Mass timber construction featured in two-story mixed-use art gallery and wine bar in Silicon Valley

The Edes Building, a two-story art gallery and wine bar in the Silicon Valley community of Morgan Hill, will prominently feature mass timber. Cross-laminated timber (CLT) and glulam posts and beams were specified for aesthetics, biophilic properties, and a reduced carbon footprint compared to concrete and steel alternatives.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021