flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

'This merger is a dream for me,' said Frank Gehry of the deal. Financial terms were not disclosed.


By Trimble | September 8, 2014
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Re
The Cleveland Clinic Abu Dhabi is one of Gehry Technologies' latest projects. Rendering: courtesy Gehry Technologies

Trimble and Frank Gehry announced today that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies. 

As part of the alliance, Trimble has acquired Gehry Technologies, the software and consulting services business that has been instrumental in delivering Frank Gehry’s visionary designs while keeping cost and schedule in line for his clients.

The alliance combines deep Architecture, Engineering and Construction (AEC) industry experience with advanced construction technology to empower visionary designers such as Gehry Partners to build groundbreaking projects on time, under budget and without change orders—enabling designers, builders and operators to collaborate more efficiently. 

"This merger is a dream for me. In Trimble, we find a partner who has like-minded ambitions and goals to create efficiencies in the AEC industry that allow the creativity of the architectural profession to flourish and deliver value-added creative solutions within the realities of our economic times. I am very excited to expand our mission with a great new partner," said Frank Gehry.  

“We are honored to enter into an association with Frank,” said Steven W. Berglund, president and CEO of Trimble. “His unique architectural vision has always challenged the conventional. Equally impactful are his views on the potential for transforming the entire design-build-operate continuum. Gehry Technologies has been key in allowing Frank to realize the potential of his designs without compromising cost or schedule. Together, we expect that our common commitment and our combined capabilities will accelerate the adoption of technology in this trillion-dollar industry with resulting breakout benefits. We are delighted with the prospect of working with Frank as he continues his strong personal advocacy for change in the construction industry.” 

Based in Los Angeles, Calif., Gehry Technologies is an AEC technology company that provides design and project management solutions, consulting services and project collaboration software tools. Gehry Technologies solutions include GTeam™ software, a Web-based 3D file management and project collaboration platform, building information modeling (BIM) technology as well as advanced project delivery services for leading owners, architects, engineers, builders, fabricators and industry professionals worldwide. The solutions allow customers of all sizes to communicate more effectively, improve design and construction quality, and accelerate project cycle times.

Gehry Technologies’ consulting services aid in the design, execution and management of the build environment. With a globally distributed team of architects, engineers, builders and computer scientists, the company delivers solutions that define and optimize project delivery processes and tools, enabling creative architecture with integrated engineering, high-precision fabrication and assembly, and improved risk management.

The combination of Gehry Technologies solutions and professional services with Trimble’s broad technology portfolio in positioning, BIM, analytics and visualization, automated machine guidance and real-time telematics accelerates total lifecycle solutions that will allow architects, engineers, contractors and owners to access data captured during the building planning, design, construction and renovation phases, providing deeper insight, better operating decisions and better asset performance.

Gehry Technologies will be reported in Trimble's Engineering and Construction Segment. Financial terms were not disclosed.

Related Stories

| Feb 10, 2014

Architecture Design Collaborative announces firm opening in Southern California

Today, Architecture Design Collaborative officially announces the launch of its firm providing a full range of architecture and interior design services nationwide. Architecture Design Collaborative offers architectural design services, comprehensive interior design services, developer collaboration, direct tenant improvement, repositioning and site planning.

| Feb 10, 2014

Ball State to host Geothermal Conference on design, drilling and equipment - April 10, 2014

To best serve the industry, Ball State University has organized a single day conference in which participants will be able to exchange technical notes, develop understandings and share experiences with design, drilling, and equipment issues related to geothermal ground source heat pump technology.

| Feb 7, 2014

DOE, Autodesk team to overhaul the EnergyPlus simulation program

The update will allow a larger ecosystem of developers to contribute updates to the code in order to improve performance and decrease the time required to run energy model simulations.

| Feb 7, 2014

Meet the new Fellows: AIA elevates 143 to College of Fellows

The AIA College of Fellows is an honor awarded to members who have made significant contributions to the architectural profession.

| Feb 7, 2014

Bernards announces executive leadership realignment

Changes reflect long-term growth plans as builder enters its fifth decade.    

| Feb 7, 2014

Zaha Hadid's 'white crystal' petroleum research center taking shape in the desert [slideshow]

Like a crystalline form still in the state of expansion, the King Abdullah Petroleum Studies and Research Center will rise from the desert in dramatic fashion, with a network of bright-white, six-sided cells combining to form an angular, shell-like façade.

| Feb 6, 2014

First look: Gensler ups the ante on airport design with new SFO boarding area

The new terminal features a yoga room, award-winning arts program, and an interactive play area for kids.

| Feb 6, 2014

End of the open workplace?

If you’ve been following news about workplace design in the popular media, you might believe that the open workplace has run its course. While there’s no shortage of bad open-plan workplaces, there are two big flaws with the now common claim that openness is bad.

| Feb 6, 2014

New Hampshire metal building awes visitors

Visitors to the Keene Family YMCA in New Hampshire are often surprised by what they encounter. Liz Coppola calls it the “wow factor.” “Literally, there’s jaw dropping,” says Coppola, director of financial and program development for the Keene Family YMCA.

| Feb 5, 2014

M&A activity down in 2013 among architecture, engineering firms: Report

In 2013, consultant Morrissey Goodale observed 168 sales of U.S.-based architecture and engineering (“A/E”) firms – down nearly 7% from the record 180 sales of U.S.-based A/E firms in 2012.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021