flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Transit-friendly apartment building now under construction

Transit-friendly apartment building now under construction

Community amenities will include a light rail commuter lounge, a cyber cafe and a 24-hour fitness center


By KTGY Group | April 22, 2014
KTGY Group, Inc., Architecture + Planning, has announced that construction is underway on Elevation at County Line Station, a 265-unit apartment community with a modern vibe in Englewood, Colo. The new $44 million community is situated on eight acres, directly adjacent to the County Line Road Park-n-Ride, and a quick walk from the light rail station across I?25 and near Park Meadows Mall. This transit-oriented residential development is slated for completion in fall 2014. Denver-based Grand Peaks Properties is the developer. KTGY is the apartment community's designer.
 
Located at 8331 S. Valley Highway in northern Douglas County, the four-story, four-building luxury apartment community features one-, two- and three-bedroom apartment homes ranging in size from 749 square feet to 1,277 square feet, with high-end materials and fixtures. Top-grade finishes include granite countertops, wood-style plank flooring, designer pendant lighting, in-unit front-loading washer and dryer, modern single-handle kitchen faucets and walls of glass overlooking the mountains.  
 
The community amenity lineup includes a light rail commuter lounge, a cyber cafe, 24-hour fitness center, business center, game room and a rooftop clubroom with an outdoor deck, fire pit, and grilling and picnic areas, providing social gathering spaces and panoramic views of the Rocky Mountains. Elevation at County Line Station is also a pet-friendly community and features garage parking, an electric car charging station, and bicycle borrowing.   
 
 
"Today's renters want the exciting, urban lifestyle and convenience, and access to public transportation enhances both. Transit-oriented communities like Elevation at County Line Station near shopping, dining, entertainment and employment deliver a higher quality of life for their residents while being more environmentally and financially sustainable,” said KTGY's Studio Director Nathan Sciarra, AIA and the project manager for Elevation at County Line Station.  
 
Pre-leasing is expected to begin within the next couple of months. For leasing information, visit www.grandpeaks.com.

Related Stories

| Jan 19, 2011

San Diego casino renovations upgrade gaming and entertainment

The Sycuan Casino in San Diego will get an update with a $27 million, 245,000-sf renovation. Hnedak Bobo Group, Memphis, Tenn., and Cleo Design, Las Vegas, drew design inspiration from the historic culture of the Sycuan tribe and the desert landscape, creating a more open space with better circulation. Renovation highlights include a new “waterless” water entry feature and new sports bar and grill, plus updates to gaming, poker, off-track-betting, retail, and bingo areas. The local office of San Francisco-based Swinerton Builders will provide construction services.

| Jan 19, 2011

Extended stay hotel aims to provide comfort of home

Housing development company Campus Apartments broke ground on a new extended stay hotel that will serve the medical and academic facilities in Philadelphia’s University City, including the University of Pennsylvania and the Children’s Hospital of Philadelphia. The 11,000-sf hotel will operate under Hilton’s Homewood Suites brand, with 136 suites with full kitchens and dining and work areas. A part of the city’s EnergyWorks loan program, the project aims for LEED with a green roof, low-flow fixtures, and onsite stormwater management. Local firms Alesker & Dundon Architects and GC L.F. Driscoll Co. complete the Building Team.

| Jan 19, 2011

New Fort Hood hospital will replace aging medical center

The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

| Jan 19, 2011

Architecture Billings Index jumped more than 2 points in December

On the heels of its highest mark since 2007, the Architecture Billings Index jumped more than two points in December. The American Institute of Architects reported the December ABI score was 54.2, up from a reading of 52.0 the previous month. 

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Architect Jean Nouvel designs an island near Paris

Abandoned by carmaker Renault almost 20 years ago, Seguin Island in Boulogne-Billancourt, France, is being renewed by architect Jean Nouvel. Plans for the 300,000-square-meter project includes a mix of culture, commerce, urban parks, and gardens, which officials hope will attract both Parisians and tourists.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021