flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Transit-friendly apartment building now under construction

Transit-friendly apartment building now under construction

Community amenities will include a light rail commuter lounge, a cyber cafe and a 24-hour fitness center


By KTGY Group | April 22, 2014
KTGY Group, Inc., Architecture + Planning, has announced that construction is underway on Elevation at County Line Station, a 265-unit apartment community with a modern vibe in Englewood, Colo. The new $44 million community is situated on eight acres, directly adjacent to the County Line Road Park-n-Ride, and a quick walk from the light rail station across I?25 and near Park Meadows Mall. This transit-oriented residential development is slated for completion in fall 2014. Denver-based Grand Peaks Properties is the developer. KTGY is the apartment community's designer.
 
Located at 8331 S. Valley Highway in northern Douglas County, the four-story, four-building luxury apartment community features one-, two- and three-bedroom apartment homes ranging in size from 749 square feet to 1,277 square feet, with high-end materials and fixtures. Top-grade finishes include granite countertops, wood-style plank flooring, designer pendant lighting, in-unit front-loading washer and dryer, modern single-handle kitchen faucets and walls of glass overlooking the mountains.  
 
The community amenity lineup includes a light rail commuter lounge, a cyber cafe, 24-hour fitness center, business center, game room and a rooftop clubroom with an outdoor deck, fire pit, and grilling and picnic areas, providing social gathering spaces and panoramic views of the Rocky Mountains. Elevation at County Line Station is also a pet-friendly community and features garage parking, an electric car charging station, and bicycle borrowing.   
 
 
"Today's renters want the exciting, urban lifestyle and convenience, and access to public transportation enhances both. Transit-oriented communities like Elevation at County Line Station near shopping, dining, entertainment and employment deliver a higher quality of life for their residents while being more environmentally and financially sustainable,” said KTGY's Studio Director Nathan Sciarra, AIA and the project manager for Elevation at County Line Station.  
 
Pre-leasing is expected to begin within the next couple of months. For leasing information, visit www.grandpeaks.com.

Related Stories

Market Data | Jan 26, 2022

2022 construction forecast: Healthcare, retail, industrial sectors to lead ‘healthy rebound’ for nonresidential construction

A panel of construction industry economists forecasts 5.4 percent growth for the nonresidential building sector in 2022, and a 6.1 percent bump in 2023.

Sponsored | Steel Buildings | Jan 25, 2022

Multifamily + Hospitality: Benefits of building in long-span composite floor systems

Long-span composite floor systems provide unique advantages in the construction of multi-family and hospitality facilities. This introductory course explains what composite deck is, how it works, what typical composite deck profiles look like and provides guidelines for using composite floor systems. This is a nano unit course.

Sponsored | Reconstruction & Renovation | Jan 25, 2022

Concrete buildings: Effective solutions for restorations and major repairs

Architectural concrete as we know it today was invented in the 19th century. It reached new heights in the U.S. after World War II when mid-century modernism was in vogue, following in the footsteps of a European aesthetic that expressed structure and permanent surfaces through this exposed material. Concrete was treated as a monolithic miracle, waterproof and structurally and visually versatile.

Urban Planning | Jan 25, 2022

Retooling innovation districts for medium-sized cities

This type of development isn’t just about innovation or lab space; and it’s not just universities or research institutions that are driving this change.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

Architects | Jan 17, 2022

OSPORTS adds Robert Hayes to lead operational and business development efforts

Hayes will guide the OSPORTS organization in its mission to offer a unique perspective to designing world-class facilities.

Architects | Jan 13, 2022

Hollywood is now the Stream Factory

Insatiable demand for original content, and its availability on a growing number of streaming platforms, have created shortages — and opportunities — for new sound stages.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021