Amid uncertainty about how an extended trade war could affect the price of construction materials and boost the cost of new construction, adaptive reuse may be an increasingly attractive option.
With the costs of building new rising, new research by the Alabama Center for Real Estate found that adaptive reuse projects cost as much as 15% to 20% less than a new construction alternative. In order for adaptive reuse to work, though, flexibility is required in zoning and approval processes such as parking and density requirements.
Many cities have made these regulations more flexible for adaptive reuse projects and their efforts serve as a blueprint for smaller communities where these projects may now be more economically viable. Also making adaptive reuse more attractive is a desire by both Millennials and Baby Boomers to live in urban areas.
There is a scarcity of developable land in many urban areas, so repurposing existing structures can be a great way to create additional housing.
Related Stories
AEC Tech | Jun 17, 2016
Driverless cars could soon start impacting commercial, retail project design
Offsite parking and more space for valet parking lines are among the foreseeable changes.
Codes and Standards | Jun 17, 2016
Bay State moves toward single BIM protocol on state projects
Massport’s guidelines a step forward for integrated BIM initiative.
Multifamily Housing | Jun 14, 2016
San Francisco voters approve tougher affordability requirement on new housing development
Critics charge that the measure may backfire and actually reduce new affordable units.
Concrete | Jun 13, 2016
American Concrete Institute releases new Guide to Shotcrete
Includes information on application procedures, testing.
Healthcare Facilities | Jun 10, 2016
Top 10 health technology hazards include some influenced by space design
ECRI Institute’s annual list includes operational and workflow issues.
Codes and Standards | Jun 9, 2016
Supreme Court ruling could aid developers on properties containing wetlands
Unanimous decision allows landowners to take regulatory decisions straight to court.
Green | Jun 8, 2016
TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1
The newly renovated 25,000-sf space achieved gold-level status.
Concrete | Jun 7, 2016
Concrete Institute publishes document providing concrete curing guidance
New curing monitoring techniques included.
Energy | Jun 7, 2016
Energy modeling payback typically as short as one to two months
Energy modeling is a ‘no-brainer—like checking MPG on a car’
Green | Jun 2, 2016
USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment
For assessing human health-related exposure scenarios for construction products.