flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Toyo Ito leads petition to scrap Zaha Hadid's 2020 Olympic Stadium project

Toyo Ito leads petition to scrap Zaha Hadid's 2020 Olympic Stadium project

Ito and other Japanese architects cite excessive costs, massive size, and the project's potentially negative impact on surrounding public spaces as reasons for nixing Hadid's plan.  


By BD+C Staff | May 16, 2014

In a petition with 14,279 supporters as of this morning, a group of Japanese architects led by Pritzker Prize winners Toyo Ito and Fumihiko Maki is calling on the Japan Sports Council to scrap Zaha Hadid's Tokyo Olympic Stadium.

They favor of an alternative plan that would involve renovating the existing Meiji Jingo Gaien Stadium.

Among their chief concerns of Hadid's stadium plan are the negative impacts the massive, 80,000-seat, 290,000-sm stadium would have on the surrounding Jingu Outer Gardens and other green spaces; the the cost and scale of the project; and the financial burden they say it places on the country's younger generations.  

According to Design Boom, Hadid’s stadium would reach a total height of 70 meters, the equivalent of a 20 story building, and would overpower its surroundings. 

Here's a look at Hadid's design for the stadium:

Related Stories

| Dec 17, 2012

CSM Group names recipient of the CSM Architect Fellowship Grant

With the money from the grant, Harlow has chosen to use it entirely for the Chapter of American Institute of Architecture Student’s Freedom by Design Program at Andrews University.

| Dec 9, 2012

AIA: Laboratory design, building for breakthrough science

To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021