flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Total Quality Logistics Stadium completes in Cincinnati

Sports and Recreational Facilities

Total Quality Logistics Stadium completes in Cincinnati

Populous designed the project.


By David Malone, Associate Editor | May 11, 2021
TQL Stadium interior

Photos courtesy Populous

Total Quality Logistics (TQL) Stadium, a 26,000-seat soccer venue, has completed construction on 12.4 acres in downtown Cincinnati. The stadium, which will be home to FC Cincinnati, connects the historic neighborhoods of Over-the-Rhine and West End.

The stadiums is wrapped in over 500 vertically-oriented aluminum fins, each fully programmable through an integrated LED video display system. During the night, the exterior offers a dynamic video display that showcases the club’s brand, atmospheric graphics, and match-day messaging. During the day, the architectural fins create a singular twisting motion that signifies the tension between two teams on the pitch.

Inside the stadium, fans have a 360-degree continuous seating bowl with no breaks, putting all the focus on the pitch. The Bailey, FC Cincinnati’s supporters’ section, is situated in the North stands. Here, 3,170 fans standing on a 34-degree slope, create a wall of sound of the pitch. Above The Bailey is the widest video board in any North American soccer-specific stadium.

 

TQL Stadium LED facade at night

 

The height and orientation of the stadium were designed to minimize shadows cast on the surrounding neighborhood while the programmable LED facade primarily faces east to respect nearby residents to the west. An expansive East Plaza will greet supporters with a grand staircase that faces the Over-the-Rhine neighborhood and serves as a front porch and a means to channel fan energy.

The Tunnel Club uses materials such as teak wood and warm tones reminiscent of institutions like the Cincinnati Music Hall while the First Financial Club was inspired by Over-the-Rhine and the city’s brewing traditions to bring a fresh take on the conventional beer hall.

In a nod to the team orange and blue color palette, the design team programmed a contemporary interpretation to express the bold hues. Copper and brass materials take the place of orange, creating warm tones while paying homage to the city’s industrial history. In place of the team’s blue, a muted dark navy hue is seen throughout the stadium from common areas to the suites to the seating bowl.

In addition to Populous, Buro Happold provided structural engineering services and Elevar served as the local associate architect. Turner Construction served as the general contractor.

Related Stories

Sports and Recreational Facilities | Jul 17, 2017

A new Rec Centre in Toronto links three neighborhoods

Community engagement impacts its design and programming.

Codes and Standards | Jun 21, 2017

Senate bill would prohibit tax money for sports stadium projects

Bipartisan legislation would prevent use of municipal bonds by pro teams.

Building Team Awards | Jun 8, 2017

Team win: Clemson University Allen N. Reeves Football Operations Complex

Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.

Sports and Recreational Facilities | May 19, 2017

Construction of $2.6 billion L.A. football stadium delayed by heavy rains

The Rams and Chargers won’t be able to move in until the 2020 season.

Sports and Recreational Facilities | Apr 21, 2017

3D printed models bring new economic district in Detroit to life

The centerpiece is the scaled replica of a new arena that puts a miniature fan in every seat.

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Sports and Recreational Facilities | Apr 19, 2017

Mercedes-Benz Stadium delayed until late August

The stadium is now scheduled to open on Aug. 26 in a preseason game between the Falcons and the Jaguars.

Concrete | Apr 7, 2017

‘Cool’ pavement creates ice rink aesthetic outside NHL practice facility

The concrete contains unique colors, aggregates, and textures.

Sports and Recreational Facilities | Apr 5, 2017

Informed design: A dynamic approach to athletic facilities design

With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021