Top University Sector Engineering Firms [2013 Giants 300 Report]

Top University Sector Engineering Firms [2013 Giants 300 Report]

Affiliated Engineers, URS, AECOM top Building Design+Construction's 2013 ranking of the largest university sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Advanced Energy Research and Technology Center, Stony Brook University; courtesy
Advanced Energy Research and Technology Center, Stony Brook University; courtesy Affiliated Engineers

 

 

 

 

 

 

 

 

 

Rank Company 2012 University Revenue ($)
1 Affiliated Engineers $47,202,000
2 URS Corp. $39,211,852
3 AECOM Technology Corp. $33,000,000
4 Buro Happold Consulting Engineers $28,695,000
5 Burns & McDonnell $25,635,000
6 STV $21,121,000
7 Parsons Brinckerhoff $19,000,000
8 Clark Nexsen $18,141,790
9 Vanderweil Engineers $15,062,100
10 KJWW Engineering Consultants $13,554,873
11 KPFF Consulting Engineers $13,000,000
12 Dewberry $12,978,808
13 Arup $11,901,904
14 Simpson Gumpertz & Heger $10,000,000
15 Bard, Rao + Athanas Consulting Engineers $9,800,000
16 Eaton Energy Solutions $8,444,164
17 TTG $6,945,100
18 Wiss, Janney, Elstner Associates $6,920,000
19 Walker Parking Consultants $6,812,298
20 Bergmann Associates $6,780,000
21 Thornton Tomasetti $6,359,540
22 Interface Engineering $6,343,831
23 Newcomb & Boyd $6,203,693
24 Heapy Engineering $6,147,420
25 P2S Engineering $5,680,501
26 AKF Group $5,419,000
27 RMF Engineering Design $5,300,000
28 M/E Engineering $5,161,300
29 WSP USA $5,087,811
30 RDK Engineers $4,508,000
31 Shive-Hattery $4,264,381
32 Glumac $4,240,000
33 M-E Engineers $3,500,000
34 SSOE Group $3,332,322
35 H.F. Lenz $3,013,000
36 Joseph R. Loring & Associates $3,000,000
37 Spectrum Engineers $2,987,125
38 TLC Engineering for Architecture $2,944,786
39 Syska Hennessy Group $2,849,438
40 Science Applications International Corp. $2,559,263
41 Smith Seckman Reid $2,519,005
42 GRAEF $2,488,859
43 Rolf Jensen & Associates $2,400,000
44 Walter P Moore $2,396,672
45 Sparling $2,394,462
46 Stanley Consultants $2,322,986
47 Peter Basso Associates $2,300,000
48 KCI Technologies $2,100,000
49 Aon Fire Protection Engineering $2,000,000
49 Middough $2,000,000
51 CJL Engineering $1,896,957
52 Brinjac Engineering $1,811,357
53 Michael Baker Jr. $1,800,000
54 ThermalTech Engineering $1,800,000
55 Henderson Engineers $1,760,023
56 French & Parrello Associates $1,650,000
57 Ross & Baruzzini $1,510,533
58 Primera Engineers $1,489,000
59 Environmental Systems Design $1,418,526
60 Bala Consulting Engineers $1,350,000
61 Bridgers & Paxton Consulting Engineers $1,349,511
62 CTLGroup $1,100,000
63 Degenkolb Engineers $1,079,993
64 Mazzetti $1,038,952
65 Karpinski Engineering $1,037,079
66 Allen & Shariff $1,000,000
67 Dunham Associates $850,000
68 Paulus, Sokolowski and Sartor $800,000
69 Wallace Engineering $750,000
70 Haynes Whaley Associates $697,591
71 OLA Consulting Engineers $600,000
72 Wick Fisher White $585,140
73 GHT Limited $300,000
74 Magnusson Klemencic Associates $214,612
75 Kamm Consulting $126,305
76 Coffman Engineers $110,000
77 Davis, Bowen & Friedel $97,200
78 G&W Engineering $95,000
79 Total Building Commissioning $75,975
80 KLH Engineers $51,615
81 FBA Engineering $50,000
82 GRW $47,152
83 Guernsey $41,913
84 Apogee Consulting Group $14,000

 

Back to the University Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021