Rank | Company | 2012 University Revenue ($) |
1 | Affiliated Engineers | $47,202,000 |
2 | URS Corp. | $39,211,852 |
3 | AECOM Technology Corp. | $33,000,000 |
4 | Buro Happold Consulting Engineers | $28,695,000 |
5 | Burns & McDonnell | $25,635,000 |
6 | STV | $21,121,000 |
7 | Parsons Brinckerhoff | $19,000,000 |
8 | Clark Nexsen | $18,141,790 |
9 | Vanderweil Engineers | $15,062,100 |
10 | KJWW Engineering Consultants | $13,554,873 |
11 | KPFF Consulting Engineers | $13,000,000 |
12 | Dewberry | $12,978,808 |
13 | Arup | $11,901,904 |
14 | Simpson Gumpertz & Heger | $10,000,000 |
15 | Bard, Rao + Athanas Consulting Engineers | $9,800,000 |
16 | Eaton Energy Solutions | $8,444,164 |
17 | TTG | $6,945,100 |
18 | Wiss, Janney, Elstner Associates | $6,920,000 |
19 | Walker Parking Consultants | $6,812,298 |
20 | Bergmann Associates | $6,780,000 |
21 | Thornton Tomasetti | $6,359,540 |
22 | Interface Engineering | $6,343,831 |
23 | Newcomb & Boyd | $6,203,693 |
24 | Heapy Engineering | $6,147,420 |
25 | P2S Engineering | $5,680,501 |
26 | AKF Group | $5,419,000 |
27 | RMF Engineering Design | $5,300,000 |
28 | M/E Engineering | $5,161,300 |
29 | WSP USA | $5,087,811 |
30 | RDK Engineers | $4,508,000 |
31 | Shive-Hattery | $4,264,381 |
32 | Glumac | $4,240,000 |
33 | M-E Engineers | $3,500,000 |
34 | SSOE Group | $3,332,322 |
35 | H.F. Lenz | $3,013,000 |
36 | Joseph R. Loring & Associates | $3,000,000 |
37 | Spectrum Engineers | $2,987,125 |
38 | TLC Engineering for Architecture | $2,944,786 |
39 | Syska Hennessy Group | $2,849,438 |
40 | Science Applications International Corp. | $2,559,263 |
41 | Smith Seckman Reid | $2,519,005 |
42 | GRAEF | $2,488,859 |
43 | Rolf Jensen & Associates | $2,400,000 |
44 | Walter P Moore | $2,396,672 |
45 | Sparling | $2,394,462 |
46 | Stanley Consultants | $2,322,986 |
47 | Peter Basso Associates | $2,300,000 |
48 | KCI Technologies | $2,100,000 |
49 | Aon Fire Protection Engineering | $2,000,000 |
49 | Middough | $2,000,000 |
51 | CJL Engineering | $1,896,957 |
52 | Brinjac Engineering | $1,811,357 |
53 | Michael Baker Jr. | $1,800,000 |
54 | ThermalTech Engineering | $1,800,000 |
55 | Henderson Engineers | $1,760,023 |
56 | French & Parrello Associates | $1,650,000 |
57 | Ross & Baruzzini | $1,510,533 |
58 | Primera Engineers | $1,489,000 |
59 | Environmental Systems Design | $1,418,526 |
60 | Bala Consulting Engineers | $1,350,000 |
61 | Bridgers & Paxton Consulting Engineers | $1,349,511 |
62 | CTLGroup | $1,100,000 |
63 | Degenkolb Engineers | $1,079,993 |
64 | Mazzetti | $1,038,952 |
65 | Karpinski Engineering | $1,037,079 |
66 | Allen & Shariff | $1,000,000 |
67 | Dunham Associates | $850,000 |
68 | Paulus, Sokolowski and Sartor | $800,000 |
69 | Wallace Engineering | $750,000 |
70 | Haynes Whaley Associates | $697,591 |
71 | OLA Consulting Engineers | $600,000 |
72 | Wick Fisher White | $585,140 |
73 | GHT Limited | $300,000 |
74 | Magnusson Klemencic Associates | $214,612 |
75 | Kamm Consulting | $126,305 |
76 | Coffman Engineers | $110,000 |
77 | Davis, Bowen & Friedel | $97,200 |
78 | G&W Engineering | $95,000 |
79 | Total Building Commissioning | $75,975 |
80 | KLH Engineers | $51,615 |
81 | FBA Engineering | $50,000 |
82 | GRW | $47,152 |
83 | Guernsey | $41,913 |
84 | Apogee Consulting Group | $14,000 |
Back to the University Sector Giants article
Read BD+C's full Giants 300 Report
Related Stories
| Nov 5, 2014
AEC firms leverage custom scripts to bridge the ‘BIM language gap'
Without a common language linking BIM/VDC software platforms, firms seek out interoperability solutions to assist with the data transfer between design tools.
| Nov 5, 2014
Survey: More than 75% of workload takes place without face-to-face interactions
With the rise of technology, much of the workday—even the most productive morning hours—is spent corresponding via email or conference call, according to a recent survey of corporate workers by Mancini•Duffy.
| Nov 5, 2014
The architects behind George Lucas' planned Chicago museum unveil 'futuristic pyramid'
Preliminary designs for the $300 million George Lucas Museum of Narrative Art have been unveiled, and it looks like a futuristic, curvy pyramid.
Sponsored | | Nov 5, 2014
How to maximize affordability and sustainability through all-wood podiums
Wood podium construction takes an age-old material and moves it into the 21st century.
| Nov 4, 2014
Zaha Hadid's first building in Shanghai debuts
Sky SOHO is the third in a trilogy of SOHO China developments designed by Zaha Hadid Architects.
| Nov 4, 2014
HOK breaks ground on colossal research complex for LG in Seoul
Located in Seoul’s Magok District, the LG Science Park provides facilities to support innovative research and industrial prototyping. HOK designed phase one of the master plan and six of the laboratory and office buildings.
| Nov 3, 2014
IIT names winners of inaugural Mies Crown Hall Americas Prize
Herzog & de Meuron's iconic 1111 Lincoln Road parking garage in Miami Beach, Fla., is one of two winners of the $50,000 architectural prize.
| Nov 3, 2014
Cairo's ultra-green mixed-use development will be topped with flowing solar canopy
The solar canopy will shade green rooftop terraces and sky villas atop the nine-story structure.
| Nov 2, 2014
Top 10 LEED lessons learned from a green building veteran
M+W Group's David Gibney offers his top lessons learned from coordinating dozens of large LEED projects during the past 13 years.
| Oct 31, 2014
Dubai plans world’s next tallest towers
Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.