Rank | Company | 2012 Retail Revenue ($) |
1 | Jacobs Engineering Group | $146,400,000 |
2 | AECOM Technology Corp. | $118,220,000 |
3 | Henderson Engineers | $44,677,299 |
4 | URS Corp. | $41,152,240 |
5 | Parsons Brinckerhoff | $19,100,000 |
6 | Wiss, Janney, Elstner Associates | $17,310,000 |
7 | Bergmann Associates | $13,000,000 |
8 | Wallace Engineering | $9,250,000 |
9 | Buro Happold Consulting Engineers | $7,176,000 |
10 | Arup | $6,574,122 |
11 | KLH Engineers | $6,500,000 |
12 | Shive-Hattery | $5,460,111 |
13 | Aon Fire Protection Engineering | $5,000,000 |
14 | Dunham Associates | $4,800,000 |
15 | Science Applications International Corp. | $4,540,119 |
16 | Magnusson Klemencic Associates | $4,310,779 |
17 | Walker Parking Consultants | $3,109,222 |
18 | Dewberry | $2,959,286 |
19 | Coffman Engineers | $2,630,000 |
20 | Rolf Jensen & Associates | $2,400,000 |
21 | Simpson Gumpertz & Heger | $2,300,000 |
22 | BRPH | $2,190,000 |
23 | AKF Group | $2,126,000 |
24 | Bala Consulting Engineers | $2,050,000 |
25 | Hixson Architecture, Engineering, Interiors | $2,000,000 |
25 | KPFF Consulting Engineers | $2,000,000 |
27 | RDK Engineers | $1,988,000 |
28 | KJWW Engineering Consultants | $1,839,865 |
29 | Davis, Bowen & Friedel | $1,833,817 |
30 | CTLGroup | $1,800,000 |
30 | French & Parrello Associates | $1,800,000 |
32 | Interface Engineering | $1,650,727 |
33 | WSP USA | $1,178,606 |
34 | Clark Nexsen | $1,103,460 |
35 | Thornton Tomasetti | $1,087,551 |
36 | Middough | $1,000,000 |
37 | Stanley Consultants | $964,786 |
38 | SSOE Group | $953,760 |
39 | TTG | $891,500 |
40 | TLC Engineering for Architecture | $835,647 |
41 | H.F. Lenz | $821,000 |
42 | Wick Fisher White | $747,679 |
43 | Eaton Energy Solutions | $738,894 |
44 | GRAEF | $687,733 |
45 | Glumac | $604,000 |
46 | OLA Consulting Engineers | $450,000 |
47 | Spectrum Engineers | $443,550 |
48 | KCI Technologies | $400,000 |
49 | Kamm Consulting | $323,365 |
50 | Sparling | $301,653 |
51 | M-E Engineers | $300,000 |
52 | Walter P Moore | $296,903 |
53 | Allen & Shariff | $250,000 |
54 | Vanderweil Engineers | $241,000 |
55 | Karpinski Engineering | $213,285 |
56 | Barge, Waggoner, Sumner and Cannon | $200,000 |
57 | Haynes Whaley Associates | $182,703 |
58 | G&W Engineering | $150,000 |
59 | Degenkolb Engineers | $146,590 |
60 | GHT Limited | $140,000 |
60 | Joseph R. Loring & Associates | $140,000 |
62 | H&A Architects & Engineers | $109,974 |
63 | Apogee Consulting Group | $72,000 |
64 | GRW | $65,210 |
65 | Guernsey | $51,330 |
66 | Mazzetti | $42,931 |
67 | Brinjac Engineering | $33,140 |
68 | FBA Engineering | $25,000 |
68 | ThermalTech Engineering | $25,000 |
70 | Total Building Commissioning | $21,208 |
71 | Environmental Systems Design | $17,060 |
Read the Retail Giants article
Read BD+C's full Giants 300 Report
Related Stories
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Sep 4, 2013
Last chance to pre-register for BUILDINGChicago/Greening the Heartland Conference at 20% savings
Attendees of the BUILDINGChicago/Greening the Heartland Expo and Conference can still save 20% off the at-site registration fee by registering online in these final days before the event opens on September 9 and concludes on September 11.
| Sep 3, 2013
'School in a box' project will place school in San Diego public library
Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.
| Sep 3, 2013
Delinquency rate for commercial real estate loans at lowest level in three years
The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago.
| Sep 3, 2013
EDGE studio, GBBN announce merger
GBBN Architects and EDGE studio of Pittsburgh, Pennsylvania are very pleased to announce the merger of their firms under GBBN Architects effective September 1, 2013.
| Sep 3, 2013
Jon Pettit (1952-2013) - DLR Group Managing Principal
Jonathan (Jon) E. Pettit, AIA, died August 19, 2013 in Seattle following treatment for cancer. He was 61. Pettit was a DLR Group managing principal and practiced for his entire professional career with DLR Group.
| Aug 30, 2013
Modular classrooms gaining strength with school boards
With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.
| Aug 30, 2013
Local Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 30, 2013
A new approach to post-occupancy evaluations
As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
| Aug 29, 2013
First look: K-State's Bill Snyder Family Stadium expansion
The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history.