Rank | Company | 2012 K-12 Revenue ($) |
1 | AECOM Technology Corp. | $100,150,000 |
2 | URS Corp. | $55,927,778 |
3 | STV | $45,937,000 |
4 | Jacobs Engineering Group | $36,550,000 |
5 | Parsons Brinckerhoff | $19,100,000 |
6 | TTG | $9,985,300 |
7 | Shive-Hattery | $7,379,425 |
8 | BRPH | $4,900,000 |
9 | KCI Technologies | $4,200,000 |
10 | Dewberry | $3,852,971 |
11 | KJWW Engineering Consultants | $3,643,844 |
12 | Thornton Tomasetti | $3,589,317 |
13 | Wiss, Janney, Elstner Associates | $3,570,000 |
14 | Joseph R. Loring & Associates | $3,500,000 |
15 | KPFF Consulting Engineers | $3,000,000 |
16 | M/E Engineering | $2,779,150 |
17 | Interface Engineering | $2,745,564 |
18 | Simpson Gumpertz & Heger | $2,700,000 |
19 | CJL Engineering | $2,507,621 |
20 | Rist-Frost-Shumway Engineering | $2,500,000 |
21 | FBA Engineering | $2,405,000 |
22 | Allen & Shariff | $2,200,000 |
23 | Coffman Engineers | $2,140,000 |
24 | Heapy Engineering | $2,086,975 |
25 | Bridgers & Paxton Consulting Engineers | $2,024,266 |
26 | RDK Engineers | $1,975,000 |
27 | AKF Group | $1,576,000 |
28 | Vanderweil Engineers | $1,553,500 |
29 | French & Parrello Associates | $1,500,000 |
30 | SSOE Group | $1,473,611 |
31 | Glumac | $1,404,000 |
32 | Peter Basso Associates | $1,400,000 |
33 | Wallace Engineering | $1,350,000 |
34 | Henderson Engineers | $1,118,069 |
35 | Brinjac Engineering | $1,080,748 |
36 | Clark Nexsen | $1,063,791 |
37 | G&W Engineering | $1,000,000 |
37 | KLH Engineers | $1,000,000 |
37 | WSP USA | $1,000,000 |
40 | TLC Engineering for Architecture | $933,884 |
41 | H.F. Lenz | $847,000 |
42 | Davis, Bowen & Friedel | $833,642 |
43 | Sparling | $785,356 |
44 | Primera Engineers | $748,000 |
45 | M-E Engineers | $700,000 |
46 | Environmental Systems Design | $610,185 |
47 | Paulus, Sokolowski and Sartor | $500,000 |
48 | RMF Engineering Design | $500,000 |
49 | OLA Consulting Engineers | $400,000 |
50 | Rolf Jensen & Associates | $400,000 |
51 | Karpinski Engineering | $379,369 |
52 | Bala Consulting Engineers | $350,000 |
53 | Eaton Energy Solutions | $312,320 |
54 | Wick Fisher White | $300,697 |
55 | Apogee Consulting Group | $278,000 |
56 | Arup | $251,475 |
57 | Aon Fire Protection Engineering | $200,000 |
57 | GHT Limited | $200,000 |
59 | Mazzetti | $182,262 |
60 | Dunham Associates | $150,000 |
61 | GRW | $135,860 |
62 | Magnusson Klemencic Associates | $109,780 |
63 | Science Applications International Corp. | $109,282 |
64 | Barge, Waggoner, Sumner and Cannon | $100,000 |
64 | CTLGroup | $100,000 |
66 | Degenkolb Engineers | $97,850 |
67 | P2S Engineering | $86,100 |
68 | Spectrum Engineers | $83,820 |
69 | Affiliated Engineers | $55,000 |
70 | Kamm Consulting | $45,861 |
71 | Newcomb & Boyd | $42,814 |
72 | Haynes Whaley Associates | $34,139 |
73 | Walter P Moore | $29,068 |
Â
Back to the K-12 School Giants article
Â
Read BD+C's full Giants 300 Report
Related Stories
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.