flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 DLR Group $38,250,000
2 SHW Group $32,328,843
3 PBK $31,760,000
4 IBI Group $27,977,860
5 HMC Architects $25,407,164
6 Stantec $21,586,209
7 Fanning/Howey Associates $20,247,000
8 Perkins+Will $19,938,211
9 Heery International $16,561,303
10 LPA $14,438,017
11 NTD Architecture $13,129,833
12 Perkins Eastman $13,050,000
13 Corgan $12,086,022
14 S/L/A/M Collaborative, The $11,581,000
15 NAC|Architecture $11,460,923
16 Moseley Architects $11,434,168
17 Fletcher-Thompson $9,620,000
18 FGM Architects $9,288,111
19 Leo A Daly $8,661,304
20 SMMA | Symmes Maini & McKee Associates $7,900,000
21 Wight & Co. $6,992,632
22 SEI Design Group $6,898,000
23 DLA Architects $5,999,790
24 SLATERPAULL Architects $5,726,536
25 Legat Architects $5,310,000
26 LS3P $5,111,880
27 Cuningham Group Architecture $4,866,792
28 Little $4,283,800
29 Ashley McGraw Architects $4,032,194
30 EwingCole $4,000,000
31 BBS Architects, Landscape Architects and Engineers $3,350,000
32 Harley Ellis Devereaux $3,134,000
33 Harvard Jolly Architecture $2,910,511
34 CTA Architects Engineers $2,868,705
35 Cooper Carry $2,856,159
36 Astorino $2,710,000
37 Goodwyn, Mills & Cawood $2,620,000
38 FXFOWLE Architects $2,610,644
39 Moody Nolan $2,500,000
40 Reynolds, Smith and Hills $2,180,000
41 Swanke Hayden Connell Asrchitects $2,000,000
42 GBBN Architects $1,600,000
43 Massa Montalto Architects $1,596,189
44 KZF Design $1,548,386
45 PGAL $1,520,000
46 Smallwood, Reynolds, Stewart, Stewart & Associates $1,490,039
47 Shepley Bulfinch Richardson & Abbott $1,413,440
48 Mithun $1,189,000
49 Environetics $1,188,686
50 HLW International $1,000,000
51 CASCO $940,000
52 Ennead Architects $880,000
53 Gensler $800,000
54 Sasaki Associates $797,830
55 Albert Kahn Family of Companies $687,568
56 HNTB Archtecture $629,682
57 CO Architects $629,000
58 OZ Architecture $565,653
59 Westlake Reed Leskosky $500,000
60 Good Fulton & Farrell $482,510
61 Rule Joy Trammell + Rubio $450,000
62 Kirksey Architecture $423,050
63 DesignGroup $408,989
64 LMN Architects $379,300
65 Hoffmann Architects $337,000
66 Morris Architects $300,000
66 Sherlock, Smith & Adams $300,000
68 Davis Brody Bond $279,429
69 TEG Architects - The Estopinal Group $278,901
70 RSP Architects $261,000
71 LawKingdon Architecture $250,000
72 JRS Architect $225,000
73 Nadel $218,464
74 Epstein $205,000
75 Adache Group Architects $200,000
76 VOA Associates $162,515
77 SRG Partnership $152,268
78 Ware Malcomb $75,000
79 Niles Bolton Associates $50,757
80 Hensley Lamkin Rachel $41,000
81 Omniplan Architects $34,217

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Jan 19, 2011

Architecture Billings Index jumped more than 2 points in December

On the heels of its highest mark since 2007, the Architecture Billings Index jumped more than two points in December. The American Institute of Architects reported the December ABI score was 54.2, up from a reading of 52.0 the previous month. 

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Architect Jean Nouvel designs an island near Paris

Abandoned by carmaker Renault almost 20 years ago, Seguin Island in Boulogne-Billancourt, France, is being renewed by architect Jean Nouvel. Plans for the 300,000-square-meter project includes a mix of culture, commerce, urban parks, and gardens, which officials hope will attract both Parisians and tourists.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

| Jan 7, 2011

How Building Teams Choose Roofing Systems

A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.

| Jan 7, 2011

Total construction to rise 5.1% in 2011

Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.

| Jan 7, 2011

Mixed-Use on Steroids

Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021