flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 DLR Group $38,250,000
2 SHW Group $32,328,843
3 PBK $31,760,000
4 IBI Group $27,977,860
5 HMC Architects $25,407,164
6 Stantec $21,586,209
7 Fanning/Howey Associates $20,247,000
8 Perkins+Will $19,938,211
9 Heery International $16,561,303
10 LPA $14,438,017
11 NTD Architecture $13,129,833
12 Perkins Eastman $13,050,000
13 Corgan $12,086,022
14 S/L/A/M Collaborative, The $11,581,000
15 NAC|Architecture $11,460,923
16 Moseley Architects $11,434,168
17 Fletcher-Thompson $9,620,000
18 FGM Architects $9,288,111
19 Leo A Daly $8,661,304
20 SMMA | Symmes Maini & McKee Associates $7,900,000
21 Wight & Co. $6,992,632
22 SEI Design Group $6,898,000
23 DLA Architects $5,999,790
24 SLATERPAULL Architects $5,726,536
25 Legat Architects $5,310,000
26 LS3P $5,111,880
27 Cuningham Group Architecture $4,866,792
28 Little $4,283,800
29 Ashley McGraw Architects $4,032,194
30 EwingCole $4,000,000
31 BBS Architects, Landscape Architects and Engineers $3,350,000
32 Harley Ellis Devereaux $3,134,000
33 Harvard Jolly Architecture $2,910,511
34 CTA Architects Engineers $2,868,705
35 Cooper Carry $2,856,159
36 Astorino $2,710,000
37 Goodwyn, Mills & Cawood $2,620,000
38 FXFOWLE Architects $2,610,644
39 Moody Nolan $2,500,000
40 Reynolds, Smith and Hills $2,180,000
41 Swanke Hayden Connell Asrchitects $2,000,000
42 GBBN Architects $1,600,000
43 Massa Montalto Architects $1,596,189
44 KZF Design $1,548,386
45 PGAL $1,520,000
46 Smallwood, Reynolds, Stewart, Stewart & Associates $1,490,039
47 Shepley Bulfinch Richardson & Abbott $1,413,440
48 Mithun $1,189,000
49 Environetics $1,188,686
50 HLW International $1,000,000
51 CASCO $940,000
52 Ennead Architects $880,000
53 Gensler $800,000
54 Sasaki Associates $797,830
55 Albert Kahn Family of Companies $687,568
56 HNTB Archtecture $629,682
57 CO Architects $629,000
58 OZ Architecture $565,653
59 Westlake Reed Leskosky $500,000
60 Good Fulton & Farrell $482,510
61 Rule Joy Trammell + Rubio $450,000
62 Kirksey Architecture $423,050
63 DesignGroup $408,989
64 LMN Architects $379,300
65 Hoffmann Architects $337,000
66 Morris Architects $300,000
66 Sherlock, Smith & Adams $300,000
68 Davis Brody Bond $279,429
69 TEG Architects - The Estopinal Group $278,901
70 RSP Architects $261,000
71 LawKingdon Architecture $250,000
72 JRS Architect $225,000
73 Nadel $218,464
74 Epstein $205,000
75 Adache Group Architects $200,000
76 VOA Associates $162,515
77 SRG Partnership $152,268
78 Ware Malcomb $75,000
79 Niles Bolton Associates $50,757
80 Hensley Lamkin Rachel $41,000
81 Omniplan Architects $34,217

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Nov 14, 2014

Bjarke Ingels unveils master plan for Smithsonian's south mall campus

The centerpiece of the proposed plan is the revitalization of the iconic Smithsonian castle.

| Nov 14, 2014

Haskell acquires FreemanWhite, strengthens healthcare design-build business

The combination expands Haskell’s geographic presence by adding FreemanWhite’s offices in Chicago, Charlotte, Nashville, and San Diego. FreemanWhite will retain its name and brand.

| Nov 14, 2014

What college students want in their living spaces

In a recent workshop with 62 college students, architects from Little explored the changing habits and preferences of today's students, and how those changes affect their living spaces.

| Nov 14, 2014

JetBlue opens Gensler-designed International Concourse at JFK

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates.

Sponsored | | Nov 12, 2014

Eye-popping façade highlights renovation, addition at Chaffin Junior High School

The new distinctive main entrance accentuates the public face of the school with an aluminum tube “baguette” system. 

| Nov 12, 2014

Collaboration as competitive advantage

A collaborative planning and design process may seem like a common-sense goal, but the concept can be a challenge to achieve in the fragmented AEC industry. SPONSORED BLOG

Sponsored | | Nov 12, 2014

Williams Scotsman plugs into the jobsite

Many of our customers conduct important business from their temporary modular jobsite office and most require access to technology to get their job done effectively and efficiently. SPONSORED CONTENT

| Nov 12, 2014

Chesapeake Bay Foundation completes uber-green Brock Environmental Center, targets Living Building certification

More than a decade after opening its groundbreaking Philip Merrill Environmental Center, the group is back at it with a structure designed to be net-zero water, net-zero energy, and net-zero waste.

| Nov 12, 2014

Refocusing the shifted line

A recent trend in the practice of architecture that I’ve been noticing is the blurring of responsibility between design and construction coordination. I’m not sure why this trend began, but the subject is worth exploring, writes FXFOWLE's Mark Nusbaum.

| Nov 12, 2014

Designs by three finalists for new Beethoven concert hall unveiled

David Chipperfield and Valentiny are among the finalists for a new concert hall being built to commemorate Beethoven’s 250th birthday in his hometown of Bonn, Germany.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021