flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Hotel Architecture Firms [2013 Giants 300 Report]

Top Hotel Architecture Firms [2013 Giants 300 Report]

Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Nova Hotel, Abuja, Nigeria; Courtesy: WATG
Nova Hotel, Abuja, Nigeria; Courtesy: WATG

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 Gensler $69,090,000
2 WATG / Wimberly Interiors $54,713,000
3 HKS $32,000,000
4 Leo A Daly $19,999,621
5 RTKL Associates $19,730,000
6 Hnedak Bobo Group $17,425,000
7 Perkins Eastman $11,600,000
8 Kohn Pedersen Fox Associates $11,251,800
9 Cuningham Group Architecture $10,019,865
10 HOK $10,011,000
11 BBG-BBGM $9,800,000
12 DLR Group $9,700,000
13 Perkins+Will $8,979,352
14 Cooper Carry $8,185,526
15 BLT Architects $7,430,000
16 FRCH Design Worldwide $6,400,000
17 VOA Associates $6,381,110
18 OZ Architecture $5,494,842
19 Smallwood, Reynolds, Stewart, Stewart & Associates $5,483,292
20 Callison $4,624,539
21 Baskervill $4,413,000
22 Skidmore, Owings & Merrill $4,320,000
23 IBI Group $4,067,059
24 Solomon Cordwell Buenz $4,000,000
25 Cambridge Seven Associates $3,841,000
26 Goettsch Partners $3,690,000
27 Adache Group Architects $3,600,000
28 Stantec $3,468,683
29 EwingCole $3,000,000
30 AXIS Architecture + Design $1,734,749
31 ZGF Architects $1,486,279
32 Rule Joy Trammell + Rubio $1,410,000
33 Kaplan McLaughlin Diaz $1,404,799
34 LawKingdon Architecture $1,400,000
35 RDH Interests $1,383,119
36 Morris Architects $1,350,000
37 Perkowitz+Ruth Architects $1,289,176
38 Ware Malcomb $1,134,000
39 HLW International $1,000,000
39 Fishbeck, Thompson, Carr & Huber $1,000,000
41 GBBN Architects $975,000
42 Kirksey Architecture $846,101
43 EDI International $754,000
44 PageSoutherlandPage $620,000
45 SMMA | Symmes Maini & McKee Associates $550,000
46 Jerde Partnership, The $500,000
47 MBH Architects $467,000
48 RSP Architects $452,000
49 WDG Architecture $439,998
50 LARGE Architecture $410,105
51 Environetics $366,993
52 Harley Ellis Devereaux $365,000
53 Legat Architects $360,000
54 BBS Architects, Landscape Architects and Engineers $340,000
55 Niles Bolton Associates $311,797
56 Moody Nolan $300,000
57 CTA Architects Engineers $290,000
58 Little $270,000
59 RNL $252,000
60 Westlake Reed Leskosky $250,000
61 LS3P $212,797
62 FXFOWLE Architects $173,487
63 NTD Architecture $171,153
64 Nadel $156,242
65 Ennead Architects $150,000
65 Goodwyn, Mills & Cawood $150,000
67 Gresham, Smith and Partners $128,262
68 PHX Architecture $120,000
69 Hoffmann Architects $113,000
70 Sasaki Associates $97,585
71 CASCO $85,000
72 JRS Architect $75,000
73 Beyer Blinder Belle Architects & Planners $18,065
74 Hoefer Wysocki Architecture $18,000
75 Epstein $10,300
76 NELSON $4,372
77 Wight & Co. $1,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021