flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

AECOM, Jacobs, and URS Corp. top Building Design+Construction's 2014 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 23, 2014
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospit
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospital in Palos Heights, Ill., give patients ample s
Rank Company 2013 Healthcare Revenue
1 AECOM Technology Corp. 180,760,000
2 Jacobs 87,770,000
3 URS Corp. 45,036,525
4 Smith Seckman Reid 40,105,600
5 KPFF Consulting Engineers 38,000,000
6 Allen & Shariff 36,000,000
7 BR+A Consulting Engineers 29,900,000
8 Affiliated Engineers 27,947,000
9 CCRD Partners 23,760,000
10 Burns & McDonnell 19,810,000
11 Parsons Brinckerhoff 17,950,364
12 KJWW Engineering Consultants 17,848,081
13 Mazzetti 16,963,459
14 AKF Group 16,432,000
15 STV 16,419,000
16 TTG 15,224,500
17 Dewberry 15,179,608
18 Degenkolb Engineers 12,635,148
19 TLC Engineering for Architecture 11,667,359
20 Zak Companies 11,620,500
21 Syska Hennessy Group 10,910,770
22 Arup 10,609,311
23 Heapy Engineering 10,211,094
24 M-E Engineers 9,657,000
25 I. C. Thomasson Associates 9,400,000
26 Thornton Tomasetti 7,774,388
27 Shive-Hattery 7,686,286
28 RMF Engineering 7,100,000
29 Sparling 6,566,306
30 Wiss, Janney, Elstner Associates 6,240,000
31 RDK Engineers 5,500,000
32 Dunham Associates 5,500,000
33 Karpinski Engineering 5,307,808
34 M/E Engineering 5,163,876
35 SSOE Group 5,111,297
36 Simpson Gumpertz & Heger 5,110,000
37 Highland Associates 4,900,000
38 Vanderweil Engineers 4,566,200
39 KCI Technologies 4,500,000
40 Coffman Engineers 4,202,872
41 Environmental Systems Design 4,142,911
42 H.F. Lenz 4,050,740
43 Ross & Baruzzini 3,980,169
44 Interface Engineering 3,888,841
45 Newcomb & Boyd 3,651,012
46 Glumac 3,605,075
47 WSP Group 3,490,000
48 Bridgers & Paxton Consulting Engineers 3,326,881
49 CJL Engineering 3,093,720
50 Henderson Engineers 3,042,727
51 Aon Fire Protection Engineering Corp. 3,000,000
52 KLH Engineers 2,168,871
53 Graef 2,092,951
54 Apogee Consulting Group 2,080,275
55 Primera Engineers 2,032,000
56 Martin/Martin 1,693,693
57 DeSimone Consulting Engineers 1,693,478
58 Spectrum Engineers 1,664,669
59 Brinjac Engineering 1,299,629
60 Wick Fisher White 1,027,071
61 Wallace Engineering 853,000
62 Magnusson Klemencic Associates 809,347
63 Bala Consulting Engineers 687,000
64 Walter P Moore and Associates 683,315
65 Fishbeck, Thompson, Carr & Huber 600,000
66 Davis, Bowen & Friedel 590,125
67 P2S Engineering 557,346
68 OLA Consulting Engineers 492,000
69 Joseph R. Loring & Associates 480,000
70 CTLGroup 410,000
71 Rist-Frost-Shumway Engineering 400,000
72 French & Parrello Associates 385,000
73 ThermalTech Engineering 350,000
74 G&W Engineering Corp. 191,800
75 Paulus, Sokolowski and Sartor 180,000
76 Leidos 170,000
77 Stanley Consultants 157,889
78 Total Building Commissioning 135,837
79 GHT Limited 100,000
80 H&A Architects & Engineers 75,000
81 GRW 53,200
82 Kamm Consulting 51,660
83 Guernsey 5,361

 

Read the Healthcare Giants article

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Feb 11, 2011

Green design, white snow at Egyptian desert retail complex

The Mall of Egypt will be a 135,000-sm retail and entertainment complex in Cairo’s modern 6th of October district. The two-story center is divided into three themed zones—The City, which is arranged as a series of streets lined with retail and public spaces; The Desert Valley, which contains upscale department stores, international retailers, and a central courtyard for music and other cultural events; and The Crystal, which will include leisure and entertainment venues, including a cinema and indoor snow park. RTKL is designing the massive complex to LEED Silver standards.

| Feb 10, 2011

7 Things to Know About Impact Glazing and Fire-rated Glass

Back-to-basics answers to seven common questions about impact glazing and fire-rated glass.

| Feb 10, 2011

Medical Data Center Sets High Bar for BIM Design Team

The construction of a new data center becomes a test case for BIM’s ability to enhance project delivery across an entire medical campus.

| Feb 10, 2011

Zero Energy Buildings: When Do They Pay Off in a Hot and Humid Climate?

There’s lots of talk about zero energy as the next big milestone in green building. Realistically, how close are we to this ambitious goal? At this point, the strategies required to get to zero energy are relatively expensive. Only a few buildings, most of them 6,000 sf or less, mostly located in California and similar moderate climates, have hit the mark. What about larger buildings, commercial buildings, more problematic climates? Given the constraints of current technology and the comfort demands of building users, is zero energy a worthwhile investment for buildings in, for example, a warm, humid climate?

| Feb 9, 2011

Hospital Construction in the Age of Obamacare

The recession has hurt even the usually vibrant healthcare segment. Nearly three out of four hospital systems have put the brakes on capital projects.  We asked five capital expenditure insiders for their advice on how Building Teams can still succeed in this highly competitive sector.

| Feb 9, 2011

Businesses make bigger, bolder sustainability commitments

In 2010, U.S. corporations continued to enhance their sustainable business efforts by making bigger, bolder, longer-term sustainability commitments. GreenBiz issued its 4th annual State of Green Business report, a free downloadable report that measures the progress of U.S. business and the economy from an environmental perspective, and highlights key trends in corporate culture in regard to the environment.

| Feb 8, 2011

AIA names 104 members to College of Fellows

The Fellowship program was developed to elevate those architects who have made a significant contribution to architecture and society and who have achieved a standard of excellence in the profession. Election to fellowship not only recognizes the achievements of architects as individuals, but also their significant contribution to architecture and society on a national level.

| Feb 4, 2011

President Obama: 20% improvement in energy efficiency will save $40 billion

President Obama’s Better Buildings Initiative, announced February 3, 2011, aims to achieve a 20% improvement in energy efficiency in commercial buildings by 2020, improvements that will save American businesses $40 billion a year.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021