Ten U.S. health systems account for more than $21.5 billion of current and upcoming construction, according to a report from BuildCentral.
“The healthcare sector continues to drive a major part of the construction market,” BuildCentral CEO Rick Kang said. “The top health systems have more than $12.3 billion in active projects plus another $9.2 billion in the planning stages.”
According to the report, three health systems each have active projects totaling at least $2 billion in value. Sutter Health, with its $2.1 billion California Pacific Medical Center Cathedral Hill Campus project in San Francisco, leads the list. New York Presbyterian Healthcare System has four major active projects in the New York City area. Scripps Health is currently replacing its Scripps Memorial Hospital in La Jolla, California to the tune of $2 billion.
Health systems with major planned projects include the University of Maryland Medical System with multiple projects that have a combined estimated value of $1.6 billion, Virtua Health with $1.5 billion, and Kaiser Permanente with $1.4 billion.
The top ten health systems ranked by combined active and planned construction value are:
The report is based on BuildCentral’s proprietary construction market research. The firm, headquartered in Chicago, compiles comprehensive reports on all major U.S. medical construction projects. The full report can be downloaded at https://www.buildcentral.com/
Related Stories
| Jan 4, 2012
HDR to design North America’s first fully digital hospital
Humber River is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.
| Jan 3, 2012
VDK Architects merges with Harley Ellis Devereaux
Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.
| Jan 3, 2012
BIM: not just for new buildings
Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.