flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.


By BD+C Staff | July 18, 2014
The 73-year-old Naval Reserve Armory building on Seattles South Lake Union dock
The 73-year-old Naval Reserve Armory building on Seattles South Lake Union dock is the new home of the Museum of History and In
Rank Company 2013 EA Revenue ($)
1 Jacobs 3,684,260,000
2 AECOM Technology Corp. 1,769,120,000
3 Parsons Brinckerhoff 316,350,284
4 URS Corp. 280,333,336
5 Burns & McDonnell 160,922,332
6 Thornton Tomasetti 145,038,225
7 SSOE Group 114,501,762
8 CRB  96,860,000
9 Wiss, Janney, Elstner Associates 88,887,000
10 Dewberry 78,770,181
11 Leidos 68,080,000
12 STV 64,756,000
13 Walker Parking Consultants 41,278,930
14 H&A Architects & Engineers 40,275,000
15 Shive-Hattery 35,354,309
16 RMF Engineering 33,375,000
17 Highland Associates 33,200,000
18 Ross & Baruzzini 28,125,074
19 Barge Waggoner Sumner & Cannon 24,655,000
20 H.F. Lenz 22,481,858
21 Hixson Architecture, Engineering, Interiors 22,100,000
22 Fishbeck, Thompson, Carr & Huber 20,400,000
23 Newcomb & Boyd 19,686,317
24 Gray Construction 18,720,000
25 Paulus, Sokolowski and Sartor 17,600,000
26 Guernsey 15,463,071
27 Graef 15,396,626
28 Integrated Design Group 13,711,800
29 Rist-Frost-Shumway Engineering 10,250,000
30 Stanley Consultants 7,925,565
31 Davis, Bowen & Friedel 7,150,059
32 CTLGroup 6,270,000
33 Primera Engineers 5,900,000
34 Carlson Design Construct 5,070,000
35 Apogee Consulting Group 4,068,954
36 GRW 3,753,047
37 Boldt Company, The 3,750,000

 

Read the Engineering Giants article

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

| Jun 14, 2012

Viscardi joins LEO A DALY as VP, corporate director of aviation programs

Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021