flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Engineering Firms [2013 Giants 300 Report]

Top Engineering Firms [2013 Giants 300 Report]

Fluor, Arup, Affiliated Engineers top Building Design+Construction's 2013 ranking of the largest engineering firms in the United States.


By BD+C Staff | July 15, 2013
This article first appeared in the BD+C July 2013 Issue issue of BD+C.
Rank Company 2012 Total Revenue ($)
1 Fluor $221,231,200
2 Arup $149,738,587
3 Affiliated Engineers $105,503,000
4 WSP USA $105,362,352
5 KPFF Consulting Engineers $91,000,000
6 Syska Hennessy Group $82,097,502
7 Henderson Engineers $63,485,775
8 Smith Seckman Reid $52,919,312
9 KJWW Engineering Consultants $51,092,154
10 Vanderweil Engineers $50,552,200
11 TTG $49,968,167
12 Glumac $47,967,000
13 Bard, Rao + Athanas Consulting Engineers $41,500,000
14 Rolf Jensen & Associates $40,000,000
15 Coffman Engineers $39,100,000
16 Environmental Systems Design $38,763,000
17 Magnusson Klemencic Associates $37,462,767
18 M-E Engineers $35,400,000
19 TLC Engineering for Architecture $34,295,957
20 RMF Engineering Design $32,300,000
21 RDK Engineers $31,201,000
22 Walter P Moore $29,092,693
23 H.F. Lenz $26,991,500
24 Interface Engineering $25,193,936
25 Degenkolb Engineers $25,127,432
26 CCRD Partners 25,100,000
27 Mazzetti 24,895,804
28 Robins & Morton 24,500,000
29 M/E Engineering 22,687,000
30 Aon Fire Protection Engineering 22,510,728
31 Heapy Engineering 22,116,941
32 Sparling 20,282,073
33 Haynes Whaley Associates 19,907,949
34 Newcomb & Boyd 18,617,195
35 KCI Technologies 18,032,000
36 Bridgers & Paxton Consulting Engineers 16,868,884
37 GHT Limited 16,834,469
38 Bala Consulting Engineers 16,430,000
39 French & Parrello Associates 15,903,300
40 ThermalTech Engineering 15,500,000
41 Joseph R. Loring & Associates 15,000,000
42 KLH Engineers 14,072,830
43 Dunham Associates 14,000,000
44 Wallace Engineering 13,350,000
45 P2S Engineering 12,962,044
46 Karpinski Engineering 12,076,943
47 Peter Basso Associates 11,016,000
48 Rist-Frost-Shumway Engineering 9,300,000
49 CTLGroup 9,000,000
50 Allen & Shariff 8,500,000
51 Wick Fisher White 8,126,951
52 Brinjac Engineering 6,890,645
53 OLA Consulting Engineers 5,500,000
54 Eaton Energy Solutions 4,430,095
55 Kamm Consulting 3,681,775
56 FBA Engineering 3,360,000
57 Apogee Consulting Group 3,331,300
58 G&W Engineering 2,408,800
59 Total Building Commissioning 616,878
60 Yates Cos., The 400,000
61 Weis Builders 300,000

 

Tags

Related Stories

| Mar 20, 2012

New office designs at San Diego’s Sunroad Corporate Center

Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.

| Mar 19, 2012

Obama’s positioned to out-regulate Bush in second term

Proposed ozone rule would cost $19 billion to $90 billion in 2020, according to the White House.

| Mar 19, 2012

Skanska promotes Saunders to VP/GM of Bayshore Concrete Products

During his more than 13 years with Bayshore, Saunders has provided products for Victory Bridge in New Jersey, Route 52 Causeway in Ocean City, N.J., and for numerous piers at Naval Station Norfolk and the Norfolk Naval Shipyard. 

| Mar 19, 2012

Smith Carter joins forces with Genivar

Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021