flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top BIM/VDC articles of 2011-2012

Top BIM/VDC articles of 2011-2012

A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.


By By BD+C Staff | January 3, 2013
A compendium of BD+Cs top building information modeling and virtual design + con
A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.
This article first appeared in the January 2013 issue of BD+C.

“BIM not just for new buildings”
January 2012

How the Ohio State University Medical Center converted 55 existing buildings from AutoCAD to BIM to improve quality and speed of decision making for facility management, maintenance, and future renovations.

/bim-not-just-new-buildings

 

 

“Two new BIM tools that make your project easier to manage”
December 2011

Two innovations demonstrate how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can be exposed by working with a 3D model.

/two-new-bim-tools-make-your-project-easier-manage

 

 

 

 

 

 

 

 

 

 

“Handy apps for AEC professionals”
April 2012

Helpful mobile apps for everyday design and construction tasks, Including BIM/VDC. Our fave: MagicPlan, which uses GPS to help you quickly measure and draw a floor plan of any room.

/18-handy-tablet-apps-aec-professionals

 

 

 

 

 

 

“Top 25 BIM AEC Firms: BIM finally starting to pay off for AEC firms, but there’s a long way to go”
July 2012

Survey of top 25 Giants 300 firms on their use of BIM. BD+C editors asked: Is BIM paying off—through cost savings, higher quality, or client satisfaction? See what leaders at Barton Malow, NELSON, Magnusson Klemencic Associates, KJWW Engineering, Syska Hennessy Group, EwingCole, Graef, and BRPH say about their firms’ use of BIM.

/bim-finally-starting-pay-aec-firms

 

 

 

“BIM in the academy: Lessons for the AEC industry”
May 2012

John Tocci, Jr., Manager of Virtual Design and Construction at Gilbane Building Company, reviews BIM in Academia, a new book that looks to reevaluate BIM’s place in the world of architectural education.

/bim-academy

 

 

 

 

 

 

 

 

 

“BIM becomes VDC:A case study in disruption”
December 2012

The growth of BIM is heralding a true disruption in the construction industry, says John Tobin, LEED AP, Director of Architecture at EYP Architecture & Engineering. It is transforming markets and revolutionizing expectations.

http://www.BDCnetwork.com/bim-becomes-vdc. +

Related Stories

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021