“BIM not just for new buildings”
January 2012
How the Ohio State University Medical Center converted 55 existing buildings from AutoCAD to BIM to improve quality and speed of decision making for facility management, maintenance, and future renovations.
“Two new BIM tools that make your project easier to manage”
December 2011
Two innovations demonstrate how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can be exposed by working with a 3D model.
/two-new-bim-tools-make-your-project-easier-manage
“Handy apps for AEC professionals”
April 2012
Helpful mobile apps for everyday design and construction tasks, Including BIM/VDC. Our fave: MagicPlan, which uses GPS to help you quickly measure and draw a floor plan of any room.
/18-handy-tablet-apps-aec-professionals
“Top 25 BIM AEC Firms: BIM finally starting to pay off for AEC firms, but there’s a long way to go”
July 2012
Survey of top 25 Giants 300 firms on their use of BIM. BD+C editors asked: Is BIM paying off—through cost savings, higher quality, or client satisfaction? See what leaders at Barton Malow, NELSON, Magnusson Klemencic Associates, KJWW Engineering, Syska Hennessy Group, EwingCole, Graef, and BRPH say about their firms’ use of BIM.
/bim-finally-starting-pay-aec-firms
“BIM in the academy: Lessons for the AEC industry”
May 2012
John Tocci, Jr., Manager of Virtual Design and Construction at Gilbane Building Company, reviews BIM in Academia, a new book that looks to reevaluate BIM’s place in the world of architectural education.
“BIM becomes VDC:A case study in disruption”
December 2012
The growth of BIM is heralding a true disruption in the construction industry, says John Tobin, LEED AP, Director of Architecture at EYP Architecture & Engineering. It is transforming markets and revolutionizing expectations.
Related Stories
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
NELSON, Torchia announce merger
Former competitors seek competitive advantage by joining forces.
| Jul 9, 2012
Integrated Design Group completes UCSB data center
Firm uses European standard of power at USCB North Hall Research Data Center.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jul 3, 2012
Trimble to acquire WinEstimator
Acquisition adds estimating software solutions to Meridian Systems’ portfolio.
| Jul 3, 2012
Summit Design+Build completes Emmi Solutions HQ
The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.
| Jul 3, 2012
TOLK now called Dewberry
The renaming indicates a simplification in Dewberry’s corporate naming conventions.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jul 2, 2012
San Francisco lays claim to the greenest building in North America
The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.
| Jul 2, 2012
Plumosa School of the Arts earns LEED Gold
Education project dedicated to teaching sustainability in the classroom.